1 / 14

Project Management

Project Management. Project Controlling Project Management Techniques: PERT And CPM The Framework Of PERT And CPM Network Diagrams And Approaches Activity-on-Node Activity-on-Arrow. Project Management. Determining The Project Schedule Forward Pass Backward Pass

woodalle
Download Presentation

Project Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Management • Project Controlling • Project Management Techniques: PERT And CPM • The Framework Of PERT And CPM • Network Diagrams And Approaches • Activity-on-Node • Activity-on-Arrow

  2. Project Management • Determining The Project Schedule • Forward Pass • Backward Pass • Calculating Slack Time And Identifying The Critical Path(s) • Variability In Activity Times • Three Time Estimates In PERT • Probability Of Project Completion

  3. Management of Projects • Planning - goal setting, defining the project, team organization • Scheduling - relates people, money, and supplies to specific activities and activities to each other • Controlling - monitors resources, costs, quality, and budgets; revises plans and shifts resources to meet time and cost demands

  4. Project Scheduling • Identifying precedence relationships • Sequencing activities • Determining activity times & costs • Estimating material and worker requirements • Determining critical activities

  5. Project Management Techniques • Gantt chart • Critical Path Method (CPM) • Program Evaluation and Review Technique (PERT)

  6. Time J F M A M J J A S Design Prototype Test Revise Production A Simple Gantt Chart

  7. PERT and CPM • Network techniques • Developed in 1950’s • CPM by DuPont for chemical plants (1957) • PERT by Booz, Allen & Hamilton with the U.S. Navy, for Polaris missile (1958) • Consider precedence relationships and interdependencies • Each uses a different estimate of activity times

  8. Six Steps PERT & CPM • Define the project and prepare the work breakdown structure • Develop relationships among the activities - decide which activities must precede and which must follow others • Draw the network connecting all of the activities

  9. Six Steps PERT & CPM • Assign time and/or cost estimates to each activity • Compute the longest time path through the network – this is called the critical path • Use the network to help plan, schedule, monitor, and control the project

  10. Questions PERT & CPM Can Answer When will the entire project be completed? What are the critical activities or tasks in the project? Which are the noncritical activities? What is the probability the project will be completed by a specific date?

  11. Questions PERT & CPM Can Answer Is the project on schedule, behind schedule, or ahead of schedule? Is the money spent equal to, less than, or greater than the budget? Are there enough resources available to finish the project on time? If the project must be finished in a shorter time, what is the way to accomplish this at least cost?

  12. Advantages of PERT/CPM • Especially useful when scheduling and controlling large projects • Straightforward concept and not mathematically complex • Graphical networks help to perceive relationships among project activities • Critical path and slack time analyses help pinpoint activities that need to be closely watched

  13. Advantages of PERT/CPM • Project documentation and graphics point out who is responsible for various activities • Applicable to a wide variety of projects • Useful in monitoring not only schedules but costs as well

  14. Limitations of PERT/CPM • Project activities have to be clearly defined, independent, and stable in their relationships • Precedence relationships must be specified and networked together • Time estimates tend to be subjective and are subject to fudging by managers • There is an inherent danger of too much emphasis being placed on the longest, or critical, path

More Related