Long Bridge Multi-Modal Connectivity Study: Status Update and Alternatives Analysis

This meeting agenda provides an overview of the Long Bridge Multi-Modal Connectivity Study's progress, alternative options, and upcoming steps. The study aims to analyze the structural integrity and capacity improvements of the Long Bridge for various modes of transportation.

woodk
Download Presentation

Long Bridge Multi-Modal Connectivity Study: Status Update and Alternatives Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TPB Technical committee Meeting September 6, 2013 District Department of Transportation Federal Railroad Administration

  2. AGENDA • Overview • Status Update • Alternatives • Schedule & Next Steps

  3. Study area

  4. DDOT received an ARRA grant from the Federal Railroad Administration to analyze: the structural integrity of the Long Bridge multi-modal connectivity and opportunities for operational improvements the long-term multi-modal capacity improvements (to include the future opportunity for high-speed and intercity passenger rail, commuter rail, transit, bike and pedestrian, auto, and freight) 2 track railroad bridge crossing the Potomac River Owned by CSX CSX, Amtrak, and Virginia Railway Express (VRE) operate on the bridge Long Bridge Overview

  5. Rail Freight Rail Passenger Amtrak/HSR VRE Marc Vehicular Streetcar Metrorail Pedestrian / Bicycle Analysis Modes Source: Mike Schaller, VRE Source: Mike Schaller, VRE

  6. NTP Site Visit with Interagency Partners Public Meeting #1 (November 13, 2012) Bridge Workshop Alternatives Development Public Meeting #2 (June 6, 2013) Alternatives Selection for Analysis Project status

  7. No Build (1) Railroad track expansion + ped/bike (2) Railroad track expansion + streetcar + ped/bike (3) Railroad track expansion + shared lanes for streetcar and vehicular + ped/bike (4) Railroad track expansion + shared lanes for streetcar and vehicular + vehicular + ped/bike (5) Four track tunnel (6) Alternatives

  8. Alternative 1

  9. Alternative 2

  10. Alternative 3

  11. Alternative 4

  12. Alternative 5

  13. Alternative 6

  14. Demand and Operations Analysis – Summer/Fall 2013 Concept Engineering – Fall 2013 Finalize Report – Fall/Winter 2013 _____________________________________________________________ Next meetings: Fall 2013: Freight Subcommittee Meeting Interagency Meeting Public Meeting #3 Schedule & next steps

  15. QUESTIONS www.longbridgeproject.com