120 likes | 196 Views
Group discussion. «. Metadata flows within GSBPM. 29-30 September 2008. Joint UNECE/Eurostat/OECD Work Session on Statistical Metadata (METIS) Geneva, 5– 7 October, 2011. Business Process Model. 2. Metadata flows within GSBPM. «. Panel Discussion Questions
E N D
Group discussion « Metadata flows within GSBPM 29-30 September 2008 Joint UNECE/Eurostat/OECD Work Session on Statistical Metadata (METIS) Geneva, 5– 7 October, 2011
Metadata flows within GSBPM « • Panel Discussion Questions • Why is it impossible to use the nine GSBPM steps in a chronological way? • For what steps? • At what steps are reference metadata captured? Can ESMS metadatacapture be detailled? 3
Metadata flows within GSBPM « Group discussion - Objectives • Classify the metadata objects • Which are thetriggersthatcreatemetadatain a statisticalprocess; • Which metadata is needed and how it is handled within the GSBPM; • Whichistheflowofmetadataacrossthephasesofthe GSBPM; • Which metadata drive processes; • Which standardscan be useful to support the flows within GSBPM; • Whichflowscorrespond to thequalitymanagement; 5
Metadata flows within GSBPM « Group discussion - Tasks • Establish the scope of the work: • Include data instances as a kind of “milestones” • Include quality indicators • Establish the degree of detail the work shall have: • detail on the decomposition of metadata objects; • detail on the depth of the model (phase/subprocess) • Identify standards and other documents relevant for this work; 6
Metadata flows within GSBPM « Expected products: • A classification for metadata • A list of metadata objects mapped to the phases where they are created, updated and used in the GSBPM • A description of the flows followed by those metadata objects • A list of metadata objects related to the management of the processes and the quality of the information in each phase • Proposals of standards that could be useful to support the processes of the GSBPM 7
Metadata flows within GSBPM Group 1 Group 2 Group 3 « 8 8
Metadata flows within GSBPM « Three work groups: • Group 1: Phases 1, 2 and 3 of the GSBPM • (Isabel Morgado) • Group 2: Phases 4, 5 and 6 of the GSBPM • (Juan Munoz) • Group 3: Phases 7, 8 and 9 of the GSBPM • (Jana Meliskova) • Conclusions 9
Metadata flows within GSBPM « Thank you for your attention 10