380 likes | 390 Views
Join us for a pre-qualification meeting at Cleveland Hopkins International Airport to discuss various engineering services including airfield, landside, and terminal projects. Learn about safety and security requirements. Contact us for more information.
E N D
WBS #: N825-18 Pre-Qualification Conference O&M General Engineering Services Robert Kennedy Director 216/265-6022 (phone) 216/265-6096 (fax) rkennedy@clevelandairport.com
Project Manager Chinonye Onyeukwu Phone: (216) 265-4684 Fax: (216) 265-4682 conyeukwu@clevelandairport.com
Pre-Qualifications Meeting Agenda Introduction General Project information Project Description Scope of Work/Services Safety Requirements Security and Operations Requirements DBE Requirements Submittal Information Questions and Answers Please send all future questions to: Sharri Muia Department of Port Control smuia@clevelandairport.com
Authorizing Ordinance ORDINANCE No. 645-17
Project Location Cleveland Hopkins International Airport Burke Lakefront Airport And Harbors
Scope of Services Sample Tasks: • Airfield Projects • Studies, evaluations, and rehabilitation of Runway and Taxiway pavements • FAA NAVAIDS systems • Design and Construction projects • Typical O&M airfield projects • Various utility projects • Airfield signage
Scope of Services Sample Tasks (Continued): • Landside Projects • Roadway infrastructure • Lighting and associated appurtenances • Structural, mechanical, and electrical analysis • Landside Signage • Parking Lots and Garages Rehabilitation • Utility projects • Building projects (Including cargo buildings)
Scope of Services Sample Tasks (Continued): • Terminal Projects • Ticketing Level • Concourses and gate areas • Baggage claim and hold areas • Various utility studies and projects • Signage
Scope of Services (Continued) • Change Order Review & Estimating • Pay Application Review • Safety Monitoring & HASP Review • Contract Administration • Submittal Review • Progress Meetings support • Office Engineer support • Field Engineer support • Record Drawings • Environmental Consultation • Staff extension support • Other Engineering support items as requested by DPC • Design Development • Bids evaluation • Project Control and estimation • Inspection and testing Services • FAA Compliance • Drafting • Surveying Services • Engineering Standards Development • Progress Meetings support • Project Scheduling & Monitoring • Project Schedule Recovery • Third party Evaluation • Technical Expertise in Litigation
Scope of Services (Continued) ALL SERVICES WILL BE PERFORMED ON AN AS NEEDED BASIS VIA INDIVIDUAL TASK ORDERS ISSUED BY DPC.
Safety Safety Programs Manager (Contact Chinonye for Safety Concerns) • Zero Injury Philosophy • OSHA/FAA/DPC Requirements • Competent Persons (As Defined By OSHA)
Security and Operations Requirements Robert Fischietto CHIA Operations Manager (216) 265-6090 Howard Phillips Security Manager (216) 265-3302
Office of Compliance and Inclusion (OCI) Contact Information: Herlinda Bradley,Manager (O) 216-265-6791 E-mail: hbradley@clevelandairport.com Rosita Turner,Contract Compliance /Prevailing Wage (O)216-265-6606 E-mail: rturner@clevelandairport.com Roman Orinoco,Contract Compliance and Monitoring (O) 216-265-6197 E-mail: rorinoco@clevelandairport.com Jermaine Brooks,Certification/Outreach Officer (O) 216-265-3389 E-mail: jbrooks@clevelandairport.com 13
OCI Requirements Points of Discussions: Provision of the DBE/ACDBE/SBE Program 2. Project Goals 3. Statement of Qualifications (SOQ) 4. SBE Certification and Validation 5. Required Sub-consultants Forms 6. Project Compliance 14
1. PROVISIONS OF THE DBE/ACDBE AND SBE PROGRAM • 1a. 49 CFR PART 26 - DISADVANTAGED BUSINESS ENTERPRISE (DBE) • 1b. 49 CFR PART 23 - AIRPORT CONCESSIONS DISADVANTAGED BUSINESS ENTERPRISE (ACDBE) • *Effective March 2013: • Small Business Enterprise element of DBE/ACDBE Program 15
2. PROJECT GOALS • Specific Project Goal_15_% • based on willingness, readiness and availability • Certified DBE/ACDBE website: http://www.dot.state.oh.us/dbe/Pages/UCP.aspx Small Business Enterprise (SBE) Assigned Goal: _6_% Note: Do not use the same DBE firm as DBE and SBE at the same time. 16
3. STATEMENT Of QUALIFICATION (SOQ) WHAT TO DO? Submit DBE Utilization Plan Must demonstrate Good Faith Efforts in obtaining DBEs Note: No Good Faith Effort will be considered a non-responsive SOQ. When selected, complete ALL the required DBE Forms
OCI Requirements Good Faith Effort 18
4. SBE CERTIFICATION AND VALIDATION • DBEs • DBEs can be SBEs but cannot be both b. Non-certified DBEs b1. Apply EBED’s SBE Certification and Validation Guidelines b2. DBE Unified Certification Application b3. Most recent three (3) years business tax returns b4. One of the following certifications: b4-1. CSB Certification - Cleveland OEO b4-2. Small Business Certification - Cuyahoga County b4-3. US SBA 8(a) Certification b4-4. NEORSD Certification b4-5. Northern Ohio Supplier Diversity Council Certification
5. REQUIED SUBCONSULTANTS FORMS 5a. DBE Forms:5a1. B-3 (DBE/ACDBE Participation Plan) 5a2. B-2 (DBE/ACDBE Affidavit) 5a3. B-4A (Letter of Intent to Perform as Subcontractor/Sub-consultant) *Good Faith Effort 5b. Non Certified DBEs and SBEs: 5b1. B-6 (Non DBE/ACDBE and SBE Participation Plan)5b2. B-4B (Letter of Intent to Perform as Subcontractor/Sub-consultant) 5c. Tier Subcontractors 4d1. B-8 (2nd Tier/3rd Tier Subcontractor/Sub-consultant) 4d2. For DBE: B-2 and B-4A; For Non DBE: B-4B 5d. Emergency Utilization of Subcontractors 4e1. B-9 (Emergency Addition-Conditional Approval of Subcontractor/Sub- \ consultant)
5a2. Enclosure B-2 (DBE/ACDBE AFFIDAVIT)5a3. Enclosure B-4A (Intent to Perform…) Enclosure B4-A (Intent to Perform as Certified DBE/ACDBE) Enclosure B2 (DBE/ACDBE AFFIDAVIT) 22
*Good Faith Effort (49 CFR Part 26.53)
5b1. ENCLOSURE B-6 (NON CERTIFIED DBE/ACDBE and SBE PARTICIPATION PLAN)
5b2. ENCLOSURE B-4B (letter of intent to perform as a non-certified dbe/acdbe AND sbe subcontractor/sub-consultant)
5c1. ENCLOSURE B-8(2nd Tier/3rd Tier Subcontractor/Sub-consultant)
5c2. TIER FORM 2 • If Tier is a DBE/ACDBE, use: • 1. DBE/ACDBE form 2 (Enclosure B-2) • 2. DBE/ACDBE form 3 (Enclosure B-4A) • If Tier is Non Certified DBE/ACDBE, use: • NON CERTIFIED DBE/ACDBE-SBE form 2 (Enclosure B-4B) • If Tier is SBE: • Apply SBE Verification and Validation rule • NON CERTIFIED DBE/ACDBE-SBE form 2 (Enclosure B-4B)
5d1. ENCLOSURE B-9 (EMERGENCY FORM) Emergency Form Requirements: • Acquire prior approval before utilization of sub/s • Submit revised documents to add/exclude a sub • For DBE – B-3, B-2, B-4A • Non DBE – B6, B-4B • For Tier – use forms accordingly • Submit a copy of sub-agreement
6. Project Compliance Requirements • 6a. Contract Clause Inclusion (29 CFR Part 5.13) • 6b. Certification and Compliance Reporting System under B2GNow
6a. Contract Clause Inclusion Assurance 49 CFR §26.13: Applied to: Contract with Prime Contractor and all sub-agreements with any subcontractor/supplier or lower tier subcontractor/supplier whether DBE, Non DBE or SBE. “The contractor, sub recipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT assisted contracts. Failure by the contractor to carry out these requirements is a material breach of contract, which may result in the termination of this contract or such other remedy, as the recipient deems appropriate, which may include, but not limited to withholding monthly progress payments, assessing sanctions, liquidated damages, disqualifying the contractor from future bidding as non-responsible.”
6b. Certification and Compliance Reporting System under B2GNow
6b. Certification and Compliance Reporting System under B2GNow What? • SBE Application • Monthly Payments Compliance Report • Project contract modifications • Participation Changes of Subcontractors • 49 CFR Part 26.53 • City of Cleveland How? Training! Training! Training!
NOTE: Additions and Substitutions of Subcontractors • 49 CFR Part 26.53 • City of Cleveland
OCI Requirements Written questions - send to designated Procurement Officer
Selection Criteria • Qualifications/Experience – 25 points • Project Approach – 20 points • Management Approach – 25 points • Key Staff – 20 points • Work Product Sample -10 points • DBE/SBE Participation: Firms shall submit the names of persons, subcontractors, joint ventures or others to be used in meeting DBE/SBE goals (Pass/Fail)
Schedule A. ADDENDUM 1: Friday, November 2, 2018 B.SUBMITTALS Wednesday, November 14, 2018
Qualifications Submittal DIRECT ALL QUESTIONS TO: Sharri Muia VIA E-MAIL TO smuia@clevelandairport.com STATEMENT OF QUALIFICATION SUBMITTAL: A. PLEASE PROVIDE 7 COPIES (1 UNBOUND) B.SUBMITTALS DUE DATE Wednesday, November 14, 2018 at 4:00 PM EST C. SUBMITTAL LOCATION Cleveland Hopkins International Airport Department of Port Control Administrative Offices 5300 Riverside Drive P. O. Box 81009 Cleveland, Ohio 44181-0009 Attention: Sharri Muia
Questions and Answers Please send all future questions to: Department of Port Control Attn: Sharri Muia via email: smuia@clevelandairport.com Deadline for all question submittals is Wednesday, October 31, 2018 by 5:00 PM EST All questions will be answered via an Addendum which will be posted online Friday, November 2, 2018.”