This project involves the consolidation of a fixed water based firefighting system. The installation, commissioning, and dismantling of the old system will take approximately 10-14 weeks. Limited space and restricted access may impact other works. Access through shaft stairs might be limited during heavy piping works.
E N D
WP04 SPS Fixed Water Based Firefighting System Anna Suwalska BE-ICS-CSE EDMS 1814348
WP04 Works EDMS 1814348 Type of work: Consolidation Location (per SPS point): • BA surface (next to the current sprinkler station) • SPS Shaft • TA Gallery, TA Passage, TA Storage Area (behind the lift) • LSS+, LSS-, Intersection Duration (per SPS point) • 10 - 14 weeks of installation • 2 weeks for commissioning • 2 - 4 weeks for dismantling of the old system (Shafts) • Start of works: Week 04, 2019 • Scheduled End: Week 30/2020 Impact on other works: • Heavy piping works (welding, lowering down pipes) – the access through the shaft stairs might be limited through a period of time. • Limited space for other works • Shafts - no scaffolding but the access through the shaft stairs might be limited • TA Passage, TA Storage Area, LSS, Intersection: Scaffolding (6.0 x 1.5 x 3.0 m) • TA Gallery – access might be difficult Other services (Plan. Activity 11195) • Power, Cabling from LSS, TA to BA surface (3 weeks before the installation Phse end) • Drainage (SMB) – 3 weeks before the installation Phase end • HSE-FB, HSE-SEE during Commissioning
WP04 Planning EDMS 1814348