1 / 17

Jose M. Lopez Middle School

2008 Exhibition of School Planning and Architecture. Jose M. Lopez Middle School. San Antonio, Texas Middle School New Construction Pfluger Associates Architects with Chumney and Associates Architects. Jose M. Lopez Middle School. Community Integration. Community Environment:

wray
Download Presentation

Jose M. Lopez Middle School

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2008 Exhibition of School Planning and Architecture Jose M. Lopez Middle School San Antonio, Texas Middle School New Construction Pfluger Associates Architects with Chumney and Associates Architects

  2. Jose M. Lopez Middle School

  3. Community Integration Community Environment: With a site in a newly developing community north of San Antonio, the North East Independent School District embraced the opportunity to encourage an ongoing partnership between the school and the surrounding areas. The site selected posed the dilemma of designing a campus on a plot of land that includes a 70 foot fall across its length. The team transformed this challenge into a design opportunity. The District called for a campus that would be flexible, functional and responsive its natural hill country setting. A prototype middle school was developed to meet the needs of the district and was used on this site. By creating new building geometries on different level terraces, much of the natural site was preserved. The natural drainage of the site was carefully considered and maintained. In addition, the orientation of the site provides ample natural daylighting, but shields out much of the harsh Texas heat.

  4. Building Identity Community Environment: The design objective was to create a middle school prototype that would allow students, parents, teachers, and the community to be proud to call their own. The upper and lower site amenities are unified by a central terraced courtyard. This courtyard features a transparent glass rotunda and elevated bridge. The bridge links the extracurricular and fine arts programs to the core-learning environment. The bridge also offers after hours access to the gymnasium and cafeteria. The gymnasium and cafeteria were designed as multi-use, adaptable spaces to offer cultural opportunities for the students and community to enjoy music, dance and drama performances. These elements are design components that designate the building’s primary entrance, and define it’s unique architectural character.

  5. Collaborative Learning Learning Environment: The design facilitates an innovative learning environment through the organization of classrooms into three distinct grade level houses. A collaborative learning center (CLC) in each house supports individual discovery and teamwork that is easily supervised by surrounding classrooms. Students using the CLC can perform independent study at forty family/consumer or industrial technology modules. Modules include interior design, bridge design, fashion design, personal finance, architecture, robotics, and many more. An open, inclusive educational environment encourages inquiry and discussion that develops essential skills and relationships between students and teachers.

  6. Variety of Places Learning Environment: The prototype school design was based on two models for middle school teaching: - Team Teaching - School within a School Included within the middle school prototype of the academic wing are a library, career and technology classrooms. The academic wing also includes the grade level houses with their CLC. Attached directly to each CLC are desktop computer labs, teacher workrooms, and small meeting rooms. The CLC is also linked to both indoor and outdoor classrooms. The variety of designed places offered within the middle school prototype are intended to foster both creativity in teaching as well as flexibility in types of learning environments. This goal that has been realized at Jose M. Lopez Middle School.

  7. Site Considerations Physical Environment – The site for the Jose M. Lopez Middle School presented challenges to the project team, which eventually shaped its design. The spaces were organized in a manner that capitalized on the natural fall of the site. One story programmatic spaces were located on the “high” side of the site, while tall/two-story spaces were located on the “low” side. Clerestory windows and deep overhangs provide ample daylight without allowing excessive heat gain. The edge of the second floor corridor has been pulled away from the southern wall, allowing natural light to filter down to the lower level corridor. The ultimate result of these efforts is a facility that boasts the lowest energy costs of any of the 13 middle schools in the district.

  8. 6THGRADE 7THGRADE 8THGRADE Variety in Learning Physical Environment – Color coded grade level houses establish identity and aid students and teachers in finding their way. Learning occurs outside as well as indoors on this campus. A semi-enclosed courtyard serves as an outdoor classroom between each of the grade level houses. Each academic house includes several flexible learning zones that further enhance the students’ education. The collaborative learning center, teacher workrooms, computer labs, small group conference rooms and widened corridors encourage impromptu and varied learning opportunities. The building design creatively employs economical uses of a variety of common materials – maintaining a visually interesting palette of colors and textures.

  9. Facility Evolution Planning Process: The District recognized a need to improve its facility design to serve middle school aged students. A committee made up of all stakeholders toured 12 of the best middle schools across Texas. The Superintendent charged the group to seek the best practices that support middle school curriculum to create a state of the art middle school prototype. Small groups studied specific activities like curriculum, extra curricular activities, and team teaching to come to determine how best to design an innovative new middle school. Many hours of collaboration and teamwork resulted in a “PLACE” not just a “space” for these middle school students. This prototype would provide innovative educational opportunities for students now and into the future.

  10. Concept Implementation Planning Process: Goals were established during the benchmark process and were followed through in an efficiently laid out plan that emphasized the division of the school by grade level pods. Each pod is self-sufficient and contains its own central learning center and support spaces. This design successfully merges innovative education practices with the neighboring environment. Jose M. Lopez Middle School responds to the surrounding land and community, while it also features comprehensive technology integration, flexibility as a teaching environment, and affords its students the opportunity to excel.

  11. Exhibition of School Planning and Architecture 2008 Project Data

  12. Exhibition of School Planning and Architecture 2008 Project Details

  13. Programmatic Innovations 3 / 5-2 3 Teams per grade 5-2 Teaching schedule Ideal MS model (140 Students/Teacher) Capacity at 100% is 1260 Capacity at 90% is 1134 The design team studied the space usage of existing facilities within North East ISD and other school districts. The determination was made to base the facility design on a 3/5-2 middle school teaching model. A 3/5-2 teaching model includes three teaching teams with five core class teaching periods, one team planning period and one individual teacher planning period. However, by providing space for floating teachers that includes meeting areas, conference rooms, storage, restrooms and phone rooms the school is flexible enough to increase capacity by 400 students without adding portables. You can maximize the utilization of every classroom every period of the day with a 3/6-1 or 4/5-2 teaching model to provide for temporary growth. Increases number of students per teacher to 168 Maintains teacher to student ratio 3 / 6-1 4 / 5-2 3 Teams per grade 6-1 Teaching schedule Capacity at 100% is 1512 Capacity at 90% is 1361 4 Teams per grade 5-2 Teaching schedule At least one Team floats 5 teachers per grade Capacity at 100% is 1680 Capacity at 90% is 1512 Two alternatives for temporary growth to accommodate larger numbers of students than ideal 3 / 5-2 middle school model

  14. Merging innovative learning spaces and the neighboring environment produced this successful design. Not only does Jose M. Lopez Middle School respond to the surrounding land and community, it also features comprehensive technology integration, is flexible as a teaching environment, and affords students many opportunities to grow and excel.

  15. Not to exceed five (10) additional slides Add additional images information

More Related