1 / 20

delivering promises, improving lives

On the Ground Perspectives Park Dale and WDH HomeBuilder Louise Murray WDH Development Manager lmurray@wdh.co.uk. delivering promises, improving lives. Why Park Dale?. Carbon neutral aspirations. Regeneration. Lasting legacy in the area. Aims of the Project.

wren
Download Presentation

delivering promises, improving lives

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. delivering promises, improving lives

  2. On the Ground Perspectives Park Dale and WDH HomeBuilder Louise MurrayWDH Development Manager lmurray@wdh.co.uk delivering promises, improving lives

  3. Why Park Dale? • Carbon neutral aspirations. • Regeneration. • Lasting legacy in the area.

  4. Aims of the Project • Mainstream Code 6 development. • Delivery ofsuper-efficient, true lifetime homes. • Create a centre for learning and excellence.

  5. The Site

  6. Energy Saving Technologies • District heating. • Heat recovery. • Water recycling. • Photovoltaic panels. • Building fabric.

  7. Biomass Boiler

  8. Heat Recovery

  9. Water Recycling

  10. Photovoltaic Panels

  11. Building Fabric

  12. Reaching Code 6 • Locally sourced materials. • Recycling. • Ecology. • Housing Quality Indicators (HQI). • Lifetime homes.

  13. Design and Construction Challenges • Balancing cost and concept. • Daylight factors. • Using traditional trades.

  14. More Design and Construction Challenges • Different approach to sequencing. • Standards of workmanship. • Quality control. • Installation manuals and occupier packs.

  15. Post-construction Issues • 40% savings on bills. • Issues with Mechanical Ventilation Heat Recovery (MVHR). • EcoPlay takeover.

  16. Lessons Learned • Concentrate on the fabric to reduce heat loss. • Detailing and workmanship. • Good MVHR. • Keep it simple.

  17. WDH HomeBuilder • Fabric first plus technologies approach. • Remove developer’s profit. • Concentrate on quality.

  18. The Future • Larger sites. • Awards and accreditation. • Considerate Constructor. • Housing Excellence Award. • EFQM (European Foundation of Quality Management).

  19. Thank you

More Related