1 / 33

SETS & REPS DEPLOYMENT

SETS & REPS DEPLOYMENT. The IC is responsible for the initial & ongoing deployment of the resources REQUIRED to support all phases of Incident operations. IC’s must maintain an awareness of the standard TFS response levels, apparatus capabilities and available specialty apparatus .

wyanet
Download Presentation

SETS & REPS DEPLOYMENT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SETS & REPS DEPLOYMENT INCIDENT MANAGEMENT SYSTEM

  2. The IC is responsible for the initial & ongoing deployment of the resources REQUIRED to support all phases of Incident operations. INCIDENT MANAGEMENT SYSTEM

  3. IC’s must maintain an awareness of the standard TFS response levels, apparatus capabilities and available specialty apparatus. (know your resources) INCIDENT MANAGEMENT SYSTEM

  4. The Deployment process starts with Communications dispatching the appropriate level of resource for the problem described by the caller (our customer). INCIDENT MANAGEMENT SYSTEM

  5. The process continues with the 1st arriving IC performing an initial Size-Up of Incident conditions to determine what resources are required to stabilize the Incident. (what do you need?) INCIDENT MANAGEMENT SYSTEM

  6. Request Assign Track Rotate Rehab Clear crews as the Incident downgrades The Deployment of resources requires the IC to: INCIDENT MANAGEMENT SYSTEM

  7. One of the most critical pieces of the Deployment process is for additional responding Apparatus to report to a Base Sector and wait to be assigned by the IC. (Controlled arrival) INCIDENT MANAGEMENT SYSTEM

  8. On Scene Crew Status: Unassigned • On Deck • Relief Cycle • Reinforce • RIT • Staged • Rehabbing • Rehabbed / Ready to go • Assigned • Initial crews • To a sector INCIDENT MANAGEMENT SYSTEM

  9. Teams being assigned at all incidents must operate within the TFS Incident Management System to ensure accountability and an effective command structure. *NO Freelancing INCIDENT MANAGEMENT SYSTEM

  10. Command needs to have a realistic awareness of the number of required tasks, their priority, and the time needed to complete those tasks prior to assigning crews to the hazard area. INCIDENT MANAGEMENT SYSTEM

  11. Once assigning units to the Fire Ground, the IC must track, account for, and manage the Work / Rest cycle of all crews. (FF Safety/Air Management) INCIDENT MANAGEMENT SYSTEM

  12. The IC’s level of organizational support needs to match the deployment of Incident resources: • (span of control) • Sectors • Command Team • Branches INCIDENT MANAGEMENT SYSTEM

  13. Sets & Reps • Based on the following scenarios: • Estimate the amount of resources (alarm level) that will be required to stabilize the Incident • The specific tasks that will be required to stabilize the Incident • How long it will take to get companies to where the work needs to be done • The tactical reserve needed to conduct safe operations INCIDENT MANAGEMENT SYSTEM

  14. Apparatus Positioning? Alarm Level – based on 360 size up? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards? First Hose line / Size / Entry Point / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Construction considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? INCIDENT MANAGEMENT SYSTEM

  15. Apparatus Positioning? Alarm Level – based on 360 size up? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards? First Hose line / Size / Entry Point / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Construction considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? INCIDENT MANAGEMENT SYSTEM

  16. Apparatus Positioning? Alarm Level – based on 360 size up? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards? First Hose line / Size / Entry Point / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Construction considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? INCIDENT MANAGEMENT SYSTEM

  17. Apparatus Positioning? Alarm Level – based on 360 size up? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards? First Hose line / Size / Entry Point / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Construction considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? INCIDENT MANAGEMENT SYSTEM

  18. Apparatus Positioning / Crew Deployment (3 vs 4 FF’s) / Equipment required? Alarm Level? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards / Stairwells / Upper Floors? First Hose line / Size / Destination? Second Hose line / Size / Location? Ventilation / When / Where / Type? Elevator considerations? Fire Spread Considerations / Interior / Exterior? IMS Considerations / Lobby Control / Entry / RIT / Account./ Sectoring / Air Management / Rehab? Worst case scenario? INCIDENT MANAGEMENT SYSTEM

  19. Apparatus Positioning / Crew Deployment (3 vs 4 FF’s) / Equipment required? Alarm Level? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards / Stairwells / Upper Floors? First Hose line / Size / Destination? Second Hose line / Size / Location? Ventilation / When / Where / Type? Elevator considerations? Fire Spread Considerations / Interior / Exterior? IMS Considerations / Lobby Control / Entry / RIT / Account./ Sectoring / Air Management / Rehab? Worst case scenario? INCIDENT MANAGEMENT SYSTEM

  20. Apparatus Positioning? Alarm Level – based on 360 size up? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards? First Hose line / Size / Destination? Second Hose line / Size / Location? Ventilation / When / Where / Type? Construction considerations—lightweight truss? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? Firefighter hazards? INCIDENT MANAGEMENT SYSTEM

  21. Apparatus Positioning? Alarm Level – based on 360 size up? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards? First Hose line / Size / Destination? Second Hose line / Size / Location? Ventilation / When / Where / Type? Construction considerations—lightweight truss? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? Firefighter hazards? INCIDENT MANAGEMENT SYSTEM

  22. Alarm Level ? Other agencies? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards? The public / Firefighters? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Extinguishment considerations? Fire Spread Considerations? Explosion Potential? Electrocution potential? Worst case scenario? Reference SOG G-HYDR INCIDENT MANAGEMENT SYSTEM

  23. Alarm Level ? Other agencies? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards? The public / Firefighters? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Extinguishment considerations? Fire Spread Considerations? Explosion Potential? Electrocution potential? Worst case scenario? Reference SOG G-HYDR INCIDENT MANAGEMENT SYSTEM

  24. Apparatus Positioning? Alarm Level – based on 360 size up? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Construction considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? INCIDENT MANAGEMENT SYSTEM

  25. Apparatus Positioning? Alarm Level – based on 360 size up? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Construction considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? INCIDENT MANAGEMENT SYSTEM

  26. Apparatus Positioning? Alarm Level – Specialty Apparatus / Agencies? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Construction considerations? Fire Spread Considerations / Interior / Exterior? Explosion Potential? Worst case scenario? Reference SOG G-HOPP INCIDENT MANAGEMENT SYSTEM

  27. Apparatus Positioning? Alarm Level / Specialty Apparatus / Agencies / Recon? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Explosive considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? Reference SOG G-HAZB / HAZC INCIDENT MANAGEMENT SYSTEM

  28. Apparatus Positioning? Alarm Level? Strategy? Primary Life Hazards? First Hose line / Size? Second Hose line / Location? Ventilation / When / Where / Type? Construction considerations? Fire / Smoke Spread Considerations / Interior / Exterior? Worst case scenario? INCIDENT MANAGEMENT SYSTEM

  29. Command Mode? Alarm Level – based on 360 size up? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Construction considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? INCIDENT MANAGEMENT SYSTEM

  30. Apparatus Positioning? Alarm Level – based on 360 size up? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards? First Hose line / Size / Destination? Second Hose line / Size / Location? Ventilation / When / Where / Type? Construction considerations—lightweight truss? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? Firefighter hazards? INCIDENT MANAGEMENT SYSTEM

  31. Alarm Level / Specialty Apparatus / Agencies / Recon? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Explosive considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? Reference SOG G-HAZB / HAZC INCIDENT MANAGEMENT SYSTEM

  32. Apparatus Positioning? Alarm Level – based on 360 size up? Strategy – Offensive / Defensive / Marginal? Primary Life Hazards? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Construction considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? INCIDENT MANAGEMENT SYSTEM

  33. End of Show Thank you INCIDENT MANAGEMENT SYSTEM

More Related