Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF). Thermal. Wes Ousley Dan Nguyen May 13-17, 2002. Summary. Concept meets scientific instrument requirements Maintain mirror modules at 20+/- 0.1 o C, mirror structures at 20+/- 1 o C Accommodate detector CCDs at –100 o C

Download Presentation

Wes Ousley Dan Nguyen May 13-17, 2002

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal Wes Ousley Dan Nguyen May 13-17, 2002

  2. Summary • Concept meets scientific instrument requirements • Maintain mirror modules at 20+/- 0.1oC, mirror structures at 20+/- 1oC • Accommodate detector CCDs at –100oC • Accommodate cryo-coolers to cool “Super Star Tracker” to 7oK • Maintain other instrument support equipments between –10oC and 40oC • Spacecraft Bus requirements met • Maintain Optic Hub, Free-Flyer and Detector spacecraft within operational temperatures over Phase 1 and Phase 2 observations • Thermal system resource requirements • TCS mass is about 50% MLI blankets and 40% heat pipe systems • Hub: 15kg, 80W heaters (Phase 1 total), $650K hardware, $1M manpower • Detector craft: 27kg, 10W, $1.1M hardware, $2.5M manpower • Average FF: 13kg, 10W, $500K hardware, $400K manpower MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  3. Design Features • Optics Spacecraft • Maintain mirror module temperatures with MLI and heaters • Mini sun shield for each mirror module minimizes impact of sun angle • Radiator on a no-sun side of each spacecraft • Phase 1 Optics Hub • All FF radiators blocked, except the one directly anti-sun • Louver on the exposed radiator minimizes heater power • Bottom-facing radiator not sufficient to keep Hub spacecraft cool • Heat pipe coupling transports some heat from Hub to exposed radiator via releasable junction • Detector Spacecraft • Sunshield required to keep instruments cool • Extreme thermal isolation required for SST and CCD detector system • CCD temperature controlled with radiator and heaters • Cryocooler radiator on spacecraft • Locate all radiators on the anti-sun sides • Heat pipes transport heat from spacecraft components to radiator MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  4. Optics Spacecraft Sun Hub radiator used when separated Radiator with Louver MLI on other exposed sides Heat pipe coupler used when together MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  5. Detector Craft Sunshield MLI blankets Spacecraft radiators MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  6. Trades and Studies • Thermally couple hub and free flyers in Phase 1 • Reduces heater power (now 80W) • Mass and hardware costs would increase; very difficult to test • Distribute radiators on free flyer sides, so heat pipes not needed • Reduces system mass and cost by about 18kg, $1M • Phase 1 heater power increases by over 300W • Large sunshield for each free flyer and hub • Slightly increases thermal stability • Increases mass and complexity • Distribute radiators on detector craft, so fewer heat pipes needed • Reduces system mass and cost by about 12kg, $500K • Component location becomes critical, and heater power increases • Critical thermal system parameters • Thermal isolation of mirrors, SST/cryocooler system, cold CCD and radiator • Heat pipe systems design and testability MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  7. Backup Slides MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  8. Instrument Accommodations • Mirror Modules • Radiate heat to space passively through MLI. • Require 1.5W of heater power to maintain each module at 20o+/-0.1C • Utilize sunshields to minimize temperature fluctuations • Thermally isolate mirror modules from spacecraft deck • CCD Camera • Cool detectors to –100oC using dedicated radiator on the anti-sun side • Detector electronic heat dissipation combine with spacecraft dissipation • Super Star Tracker • Utilize ACTDP cryo-cooler to maintain tracker at 7oK • Radiate cryo-cooler rejected heat at the spacecraft radiator sized to maintain at 10oC MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  9. 1 km Science Phase #2 High Resolution Science Phase #1 Low Resolution 200 km 20,000 km Mission Sequence Launch Transfer Stage MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  10. Component LayoutHub Core & Petal Hub Core Hub Petal (6) Detector S/C Payload Adapter Fitting Optical Module (9) Optical Module (11) Comm Antenna (S/C to S/C 0.3 m) LOS Laser MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  11. Component LayoutDetector Solar Array (4.5 m2) Comm Antenna (Ground/SpaceCraft 0.5 m) Comm Antenna (S/C to S/C 0.3 m) Comm Antenna (Ground/SpaceCraft 0.5 m) LOS laser receiver CCD Electronics CCD Camera MAXIM-PF, May 13-17, 2002Goddard Space Flight Center