An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Robotic Tiger http://www.plasticpals.com/?p=30286 P13029

  2. Agenda • Project Recap/Proposed Design • Updated Engineering Specs • Customer Needs • System Connections & Interactions • McKibben Air Muscle Testing • Air Supply Selection • Power Supply Selection • Logic Selection & Implementation • Shell/Covering Design: Aesthetics • CAD Model • Model Analysis • Bill of Materials • Risk Assessment • Test Plan • MSDII Schedule

  3. Project Recap/Mission Statement • The project goal is to create a robot that mimics a jumping tiger both dynamically and to a lesser extent, aesthetically • The jumping force is to be provided by air muscles

  4. Customer Needs

  5. Proposed Design: • Completely self contained robotic tiger • On board air supply, power supply, controls, & muscles • Utilizes McKibben Air Muscles to create jumping motion • Patterned attachment holes in legs to allow for air muscle testing and adjustability • Air release controlled using an ArduinoBoard and sprinkler valves • Rechargeable power & refillable PVC pressure chamber

  6. Specifications

  7. System Connections Tiger Jumps Forward

  8. Air Muscles • Rubber tube inside of a braided mesh sleeve • Pressurized tube inflates causing the mesh to contract in length • Closely mimics biological muscles

  9. Pressure Chamber Design • Topics of concern • Flow Rate • Currently the muscles fill to slowly to lift the robot from off the ground. • Force during contraction • Currently we are able to achieve a maximum force of about 30lb per air muscle. However the force during the contraction is much lower resulting in slow weak movements. • Bottlenecking • This occurs at all the current joints where air is flowing and is impacted by the smallest inner diameter of the first connection currently this is the solenoid. (shown on the left) Even with larger port sizes (3/8” shown) for fittings the valve inlet and outlet is small (yellow) and restricts flow.

  10. Proposed solution • Design to overcome obstacles • Use high flow rate valves • The current solenoid valves shown on the previous slide do not have good flow rate as demonstrated in the YouTube videos. The solution to this issue is the use of sprinkler valves, they are rated for the pressure required and the offer very high flow rate. This high flow rate will help achieve a faster muscle fill and cause the robot to jump.

  11. Proposed Solution • Design to overcome obstacles • Use larger fittings • The current muscle fittings have a small port ID and will need to be increased to allow the muscle to fill at a faster rate.

  12. Proposed solution • Design to overcome obstacles • Change the pressure chamber • Safety??? • The current use of a 3000 psi pressure chamber with 60 psi regulator while good for previous air muscle projects limits the flow rate of the air leaving the chamber. The proposed solution utilizes a lower 20-120 Psi chamber that will allow a greater flow rate leaving the nozzle. Fill location Pressure chamber This Pressure chamber was designed with the use of a very rough calculation to check the final muscle pressure in the muscles was optimal while the pressure in the tank was set to 60Psi. Valve location

  13. Controls Selection • What we are planning to use: • Arduino Mega 2560 • Simple programming language • 54 channel capability • Fully autonomous • Cost effective (existing part)

  14. Power Supply • 9V battery to power Arduino board • 2000mAh 24V NiMH battery to power sprinkler valve solenoids • Heavy but free • Solenoids • Draw 400mA for 1 sec to hold valve open, each • At 20 jumps per hour, battery lasts 300 hrs

  15. Solenoid Control Board • Provides signal from the microcontroller to the solenoid valve for muscle actuation. • There will be one iteration of this circuit per solenoid used to control muscle contraction order.

  16. Jump Logic Power On Contract muscle Group 1 Reset Muscle Positions to normal Contract muscle Group 2 Wait for Go Input Command Yes Contract muscle Group 3 Go? Return Wait No Release muscles

  17. Testing • Continued air muscle testing was preformed (different way of mounting air muscles tested; hooks on the fitting vs mesh loop used) • Pre-compressing the mesh and stretching the muscles to get a bit more deflection • Wooden leg built for project feasibility testing • Attaching multiple muscles to a leg to get more force • https://www.youtube.com/watch?v=_ObyHcsklsw

  18. Wooden leg Prototype • Problems Encountered and things we Learned: • Need for Tension on muscles for movement to occur • Need for weight on upper body link • Lack of a stop for the upper body link • Unable to launch with stability with only one leg • Leg needs to be angled in order to jump desired way • No way to return to home position yet • Could be improved with faster firing muscles (large orifice size) https://www.youtube.com/watch?v=1i3mJSSaIqI https://www.youtube.com/watch?v=qq48kK5-Li4 https://www.youtube.com/watch?v=5hcW5bUXf6k

  19. Overall Design of Robotic Tiger

  20. General Dimensions

  21. Mass Properties • Weight Analysis • Assembly with PVC system 2-tanks ~ 18 lb • PVC system 2-tanks ~ 5 lb • Hind Leg Assembly ~ 1 lb x2 • Front Leg Assembly ~ .8 lb x2 • 80/20 Body ~ 10 lb This picture shows the center of mass as calculated by SolidWorks 2012.

  22. Body Design • Body Design Merits • Strong • Adjustable • Easily test multiple configurations • Light Weight • No Machining

  23. Leg Design • General Design Merits • Adjustable • Muscle anchor points • Hard stops • Pivot points • Simple • Easily Manufactured • Cheap • Versatile • Ability to test and idealize multiple configurations • Light Weight

  24. Leg Design Cont. • Pivot Points • Rod and Shaft Collar Design • Cheap • Proof of concept – prototype • Main Body – Leg Connector • Fork Style Holster • Simple • Proof of concept – prototype • Rod and Shaft Collar

  25. Leg Design Cont. 1 4 5 2 6 3

  26. Hind Leg Design • Function • Extension • Needs to extend with enough force to lift robot off ground • Air muscles in lever configuration • Retraction • Springs • Need to bring legs back but not interfere with extension to extensively This picture is meant to be a visualization of our current idea for muscle ( ) and spring ( ) placement.

  27. Front Leg Design

  28. Jump Dynamics • Simulation of take off • Reinforced the need for hard stops on legs • Inputs • Joint moments • Lengths • Masses/CM locations • Initial Angles • Outputs • IC’s for free flight

  29. Jump Dynamics • Future – implement series of event detections • Fix each link when it reaches 45° • Remove the ground constraints at each foot when the normal force is zero

  30. Free Flight Dynamics • Simulation models free flight of tiger • IC’s needed • Angles and rate of change • Position of foot • Uses • Test different setups • Find spring force needed for return

  31. Free Flight Dynamics • Inputs • Spring coefficient • Damping coefficients • Centers of mass • Masses • Lengths • Outputs • Distance traveled • Animation/ positioning • Time for joint return

  32. Free Flight Animation • Future work • Adjust system parameters • Event detection • Receive IC’s from jump program

  33. Bill of Materials

  34. Risk Assessment

  35. Test Plan For MSDS II • Further air muscle testing • Looking for faster fill times • Deflection and Force for bigger tube and mesh size • Larger Impulse • Testing with pressure vessel design • Testing full build prototype

  36. Updated Schedule- MSDII

  37. Questions? Thank you for your time and feedback