Applications Review

Applications Review. RWL Jones GridPP12. ATLAS. Risks: Delayed middleware, raid changes in framework, competition Progress New GANGA version (first deliverable) for ATLAS use with: plug-in to ATLAS production system through ADA plug in for ATLAS AMI (metadata system)

Download Presentation

Applications Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Applications Review RWL Jones GridPP12

  2. ATLAS • Risks: • Delayed middleware, raid changes in framework, competition • Progress • New GANGA version (first deliverable) for ATLAS use with: • plug-in to ATLAS production system through ADA • plug in for ATLAS AMI (metadata system) • Developing ADA job editor and builder, AMI browser • Support of Grid operations – • software kits and distribution tools (ADA package management) • support for OS variants • Frederic Brochu as production manager • will be part of the Grid tool selection ream • Issues • Interoperability issues between Grids • SE issues • LCG Castor failures • RLS corruption (transfer and m/w failure).

  3. LHCb • Risks: • Technology incompatibility • Changing metadata/prodsys requirements • Dependence on ARDA etc. • Progress • No level-1s due until the end of 05Q1. • Production console prototype advanced because of changed DC schedule. • Production desktop release in DIRAC was a level-1 in GridPP1, now delivered and in use. • Bookkeeping interface developed in ARDA context. • A Tomcat servelet is deployed • The XML-RPS service development is suspended in favour of the GANGA/ARDA interface. • Issues • Changing DC planning • Integration with/dependence on GANGA and ARDA.

  4. GANGA • Risks: • Contention between ATLAS and LHCb objectives • Competition • Sudden changes in frameworks • Middleware and metadata delays. • Progress • Revision of design underway to optimise link to client systems. • Updates to job registry to allow reloading of pre-repackaging jobs. • Improvements in the threading and monitoring of the core modules. • Athena (Tan, for ATLAS) and Brunel (Soroko for LHCb) modules plugged-in using PyBus. Improvements in the DIRAC and DaVinci application handlers. • Python bindings for DIAL, access to dial classes using PyDial • Allows access to the ATLAS production system etc. • A prototype job submission is implemented. • Jobs splitting is being developed and extensive testing underway. • Issues • Slight delays in level-2s because priority given to experiment-specific features • expected they will be recovered during Soroko’s visit to CERN. • Similar short trip by Harrison and Tan to BNL (2 weeks) requested to move things forward.

  5. CMS • Risks: • Everything! • They list withdrawal of an experiment • Progress • Significant contribution to PhEDEx – could be of more general use. • Can sustain TB transfers • Works across LCG and Grid3 • Work towards bookkeeping metadata system • Unification of Italian (Grape) and UK (Gross) job submission. • BOSS will be re-engineered to include required functionality • R-GMA performance studies indicate it will scale, deployment on LCG-2 test bed • Testing continues in CMS context • Issues • They list withdrawal of an experiment as a risk! • Concerns about disparate effort met in large part by central planning

  6. SAMGrid • Risks: • Almost everything • They also list withdrawal of an experiment • Progress • CDF • Integrating SAM and Grid3 • Is this covered by JIM/RunJob deliverables? • basic job submission demonstrated. • JIM installation at Oxford and Glasgow. • SAM v6 switch took longer than needed because of memory lean in db-server. • D0: • Installing and testing SAMGrid at IC to allow P17 reprocessing. • Adding reprocessing to D0RunJob. (Level-2s on track) • SAM interfaces underway to allow the reprocessing to be of general use. • Issues • They list withdrawal of an experiment as a risk! • Managerial – need for more clearly defined Level-3s • CDF plans may face major changes after central review • When do the Regional Analysis Centres become live and start reporting?

  7. BaBar • Risks: • LCG and other middleware • Gird divergence/interoperability • Breaking dependence on Objectivity • Progress • Requirement capture for distributed analysis complete. • Grid submission Manchester/RAL, but problems with conditions db access, environment variables • RLS read-write access to Italy demonstrated • Issues • Reporting! • Affect of late hiring on delivery

  8. QCDGrid • Risks: • External middleware • Staff retention • Change of project scope • Progress • ILDG look likely to adopt QCDgrid software • C++ + Globus + EDG security • Risk analysis and stress testing requirement capture complete • Good progress on stress testing itself and software installation and distribution on UKQCD machines. • QCDOC is now installed and being shaken down in Edinburgh along with ‘Tier 1’ 50 Tbyte store. • Issues • Contact/overlap with other GridPP activities

  9. PhenoGrid • Risks: • No risk assessment • Progress • ? • Issues • Reporting! • Affect of late hiring on delivery

  10. Portal • Risks: • Beaten to the task by others • Progress • Requirements complete but technical review document not on time. • Needs discussion with Rob Allen • First portlet built allowing GridSphere application access to DN server • can issue visual_grid_proxy_init using jnlp. • Issues • Need swift progress • Links with other projects need to be established