1 / 1

Time line – COUNCILS ONLINE

Time line – COUNCILS ONLINE. Train the Trainer training 3-28 Nov. 2003. J. F. M. A. M. J. J. A. S. O. N. D. User Acceptance Testing. Phase 1 Definition. Phase 1 Design. CRP = Conference Room Pilot. CRP 2. Easter Shutdown. Phase 1 Build. Sys Tst. Design Review. CRP 1.

Download Presentation

Time line – COUNCILS ONLINE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Time line – COUNCILS ONLINE Train the Trainer training 3-28 Nov 2003 J F M A M J J A S O N D User Acceptance Testing Phase 1 Definition Phase 1 Design CRP = Conference Room Pilot CRP 2 Easter Shutdown Phase 1 Build Sys Tst Design Review CRP 1 Phase 1 includes Finance, Purchasing, HR, Document Management, Project Management, Applications, Land Information and Rates UAT Prep UAT End User Training 5 Apr–11 May Christmas Shutdown 2004 J F M A M J J A S O N D UAT Cutover Pilot Roll-out Phase 2 Design & Build P2 UAT P2 Pilot P2 Roll-out Phase 2 includes Libraries, Asset Leasing, Plant & Equipment, Works Estimating, Reservation Mgt P3 Design & Build P3 UAT & Roll-out Easter Shutdown Phase 3 – web enabling and integrating Customer Relationship Management Page 1

More Related