1 / 6

PROJECT MESA #11 Broadband M obility for E mergency and S afety A pplications TSG SYS#06

PROJECT MESA #11 Broadband M obility for E mergency and S afety A pplications TSG SYS#06 Action Items Update Jeff Bratcher – Chairman TSG SYS Edinburgh, Scotland, October 25-28, 2005. MESA Organization. Organizational Partners. MESA SC. (Steering Committee).

xanto
Download Presentation

PROJECT MESA #11 Broadband M obility for E mergency and S afety A pplications TSG SYS#06

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROJECT MESA #11 Broadband Mobility for Emergency and Safety Applications TSG SYS#06 Action Items Update Jeff Bratcher – Chairman TSG SYS Edinburgh, Scotland, October 25-28, 2005

  2. MESA Organization Organizational Partners MESA SC (Steering Committee) Service Specification Group Technical Specification Group Services & Applications System SSG SA TSG SYS System Technical Specifications MESA Structure Liaison Standardization bodies

  3. TSG SYS Action Item Update • Action Item I. – Work Item #14 – Identification and Derivation of Technical Requirements from SoR • Current draft version: 1.0.2 – Lucia De Francesco • Inputs from: ITS, BAPCO, P25 • Behind schedule – should be focus of next 6 months effort based on updated SoR • Action Item II. – Work Item #12 – System Reference Model • Current draft version: 1.2.6 – Luke Klein-Berndt • Inputs from: ITS, BAPCO, P25, TIA, NIST, Motorola, APCO • Conference Call – Aug. 10th • Submit for approval at MESA #11  version 3.1.1 • Action Item III. - Work Item #08 – Technologies with Potential Applicability to Project MESA • Current draft version: 1.5.4 – Gianni Redaelli • Inputs from: Cingular Wireless, Arraycomm, TIA, Motorola, ETSI

  4. TSG SYS Action Item Update (cont.) • Action Item IV. – APCO Presentation • Completed and presented at APCO Conference in Denver on August 24 • Action Item V., VI. – n/a • Action Item VII. – Short and Long term plan for Special Task Force • Cancelled per SC guidance • Action Item VIII. – Inputs from U.S. initiatives that fund first responder activities • Dereck Orr – Program Manager of National Institute of Standards Technology/Office of Law Enforcement Standards (NIST/OLES) to speak at MESA #11

  5. MESA Specification Development Plan Identification and Derivation of Technical Rqmts from SoR Work Item SYS #14 (draft v1.0.2) Rap: Lucia De Francesco Statement of Requirements Work Item SA# 01 (v3.1.4) Rap: Jens Behrens System Reference Model Work Item SYS #12 (draft v1.2.6) Rap: Luke Klein-Berndt Derived System Requirements WI SYS0070014v311 System Reference Model WI SYS0070012v311 Technologies with Potential Applicability to Project MESA Work Item SYS #08 (draft v1.5.4) Rap: Gianni Redaelli Derived System Specification Technologies with Potential Applicability to Project MESA WI SYS0070008v311 LiaisonStandardizationbodies Iterative feedback among various tasks is assumed and is not explicitly indicated ETSI/TIA

  6. Next Steps • Approval of WI #08 – Technologies with Applicability • Living document that will need updating as technologis mature • Approval of WI #12 – System Reference Model • Submit for approval during MESA #11 • Work Item #14 – Identification of Technical Requirements • Should be updated based on revisions to SoR • Should be immediate focus of working group activities • New Work items?

More Related