230 likes | 381 Views
AB-PO-PH 2006-2008 Pulsed and High voltage converters. PS complex exploitation: active maintenance (documentation, improvement, spare), follow-up operation, physicist requirements
E N D
AB-PO-PH 2006-2008Pulsed and High voltage converters • PS complex exploitation: active maintenance (documentation, improvement, spare), follow-up operation, physicist requirements • I-LHC project: Pulsed, high voltage and commercial converters e-cooling, PS installation, commissioning, physicist requirements. • ISOLDE: New installation and follow-up the requirements • REX-ISOLDE: Power converters integration, interface PO/CO. • CNGS: Power converters (horn and reflector), commissioning. • CONSOLIDATION: power converters: PS (gamma-transition), Linac (dipoles, quadripoles , HT RF), PSB dipoles transfer • Stand test 3MeV( Linac 4): Follow-up requirement, CAT collaboration, installation stand test 3MeV. • Multiturn ejection: new lay-out bump 16 • Dump PS: section 47, 48. CTF3: power converter source laser. Responsibilities: AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH (Pulsed and High voltage converters )Team 2006 1 January 2006 1 June 2006 • CRAVERO Jean-Marc • DAVID Nicolas • De ALMEIDA MARTINS Carlos • JOFFE Stéphane • LAHAYE Joël • MATHIEU David • PARRA-LOPEZ Julien • SIMONET Gilles • ROYER Jean-Pierre Section Leader • CRAVERO Jean-Marc • DAVID Nicolas • JOFFE Stéphane • LAHAYE Joël • MATHIEU David • PARRA-LOPEZ Julien • ROYER Jean-Pierre • SIMONET Gilles • De ALMEIDA MARTINS Carlos Section Leader “transition douce” : For Carlos knowledge different equipments, team and start-up converters in the complex PS under responsibility PO-PH. AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • Exploitation, Operation, active maintenance (documentation, improvement, spare), follow-up operation, physicians requirements. • 2006: Linac2 ( protons), PSB (Booster), PS, ISOLDE, REX-ISOLDE, AD, LEIR, CTF3. (New start for PS and AD) • 2006: I-LHC commissioning: LEIR electron-cooling, LEIR ligne ETL, Linac3 spare OCEM and PS modifications. • 2006: CNGS commissioning (horn and reflector) • Piquet follow-up, 3 persons PO-PH in the piquet team (N. David, S. Joffe, J. Parra-Lopez) AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • I-LHC ( linac3, LEIR,PS): Pulsed, high voltage and commercial power converters. 2006 installation and commissioning. • Pulsed dipoles5 HZ (14) , commissioning now (linac 3) • Pulsed quadripoles 5HZ (11), commissioning now (linac 3) • HV electron cooling and RF (19) -IT 3225 AB-LHC- (FUG) • HV RF power converters LEIR (2)- IT 3257 AB-LHC- (OCEM) • Commercial power converters 1Q (30) -PE 21785/AB- (Delta) • Commercial power converters 4Q (90)-IT 3262 AB- (Danfysik) • 2006:Pulsed septum ejection power converter (~ 40 kA, 2kV) • 2006:Pulsed septum injection PS, septum 26 (~20 kA, 2kV) • 2006:Power converter bump 26 PS (100A, 500V, 5msec) AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters I-LHC project AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters Ejection septum power supply (LEIR) AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters Injection PS SMH 26 Ejection LEIR SMH 40 AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008 Pulsed and High voltage converters ISOLDE: New installation in Isolde class A Lab (bat.179), Balzers Lab. (bat.26), RFQc (bat 275) 2006 : Installation before mars 2006 (see functional specification EDMS 585297) Budget ISOLDE 60 kFS installation Balzers lab, pumpstand 3 Station Degazage Work FSUs cabling, crate, installation : ~ 10 weeks Order DELTA power converters Concern: PLC AB-CO ? AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006 -2008 Pulsed and High voltage converters ISOLDE: New installation in Isolde class A Lab (bat.179) and Balzers Lab. (bat.26) RFQc (bat 275) 2007-2008 : installation OFF-LINE 2 front-end test RFQc on line Budget ISOLDE ~ 290 kCHF (see functional specification) AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006Pulsed and High voltage converters • REX-ISOLDE integration AB • ~ 146 power converters, 34 different types. • Rationalisation control-interface CO-PO, (first part Nov 2005-Mars 2006) • Regroupement et augmentation de la charge des faisceaux d’ions radioactifs en combinant TRAP et EBIS afin d’obtenir des faisceaux plus lourds (n+ q) AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters PARTIAL LAY-OUT REX-ISOLDE ( 2006 ) AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • CNGS: power converters (horn and reflector); collaboration department PH. • 2006 Full operation and exploitation responsibility after commissioning • Electronic PO for the pulsed power converters horn and reflector. • Control interface 1553 and timing TG8 (CO). • Adaptation timing, internal software. • Adaptation hardware • Installation 2 power converters BA4 in progress ( responsibility department PH) • 2007-2008 Full responsibility of the 2 power converters. AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters 4th NBI, 7 - 11 November 2003 courtesy Gilles MAIRE AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • Consolidation: • Pulsed power converter for PS gamma-transition • Pulsed power converters for dipoles (15) Linac2 et (10) PSB. 2006 • Pulsed power converters for quad new proto (2006) for large series (80) Linac 2 (2007-2008) • CONSOLIDATION power converters: PS (gamma-transition) (8 ?), Linac (dipoles 20A 600V(30) , quadripoles 500A 1000V (80), HT 25kV 6A (2). AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • Consolidation: PS gamma-transition Doublets: 1000A/-1000A in 0.7 ms, T pulse 60 ms Triplets: 500A in 54 ms linear part, T pulse 94 ms AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • Stand test 3 MeV: follow-up Linac4 (approval end 2006?) • Beam test 3 MeV beginning 2007 ? • Quad power converters (11), dipole power converters (2) • High power converters HT RF (2) collaboration CAT (12 power converters for Linac 4.) New requirement Source H-: 2 solenoids 1200A pulsed flat-top 800 microsec., 6 powers converters dipoles 8A DC, 1 bending measure 50A 35V. AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • Stand test 3 MeVcollaboration CAT AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters (DRAFT) List of components whose supply has to be coordinated by CERN: 1- 15kV High frequency charging power supply (Commercial as suggested by CERN from a CERN supplier). 2- IGBT and SCR switch from BEHELKE/ Eupec/ ABB or others as per availability. 3- Storage capacitors from a European company. 4- Filament power supply. (Commercial as suggested by CERN) 5- Modulator anode DC supply. (Commercial as suggested by CERN) 6- Vacuum ion pump supply 7- Crow Bar switch assembly with detection and actuation electronics 8- Solenoid power supply for the klystron. 9- Control and interlock system as per CERN standard. Stand test 3 MeVcollaboration CAT AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • Multiturn Ejection: reorganisation of the pulsed power converters for ejection 16.(Bump 16, etc..) foreseen start 2007 (to be confirmed) Proposed converter layout: new layout of the PS slow bump 16 Power converters specifications for the new bump16 for multi-turn extraction Budget: 235 kCHF 1 man/year (if QKE 58 not used as spare) AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • Dump PS section 47 and 48 Studies in progress (35V 45A), installation for star-up 2006 (bat 365). • CTF3: power converter for laser system photo-injector 2007 ? 2008 ? AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters CONCERNS: • PLC:ecooling LEIR, ISOLDE, REX-ISOLDE People in PO-CC team ? Daniel ? When ? • New responsibility ? Responsibility Converters HT RF LHC Responsibility Converters HT RF PS (inverpower) Analysis HT power converters RF (divers type) • Future (stand test 3MeV, Linac4) Power converter HT for modulator, collaboration CAT Test necessary for the future (Linac 4) activity HT to be developed 2006 post engineer HT AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters SECURITY Aspect important in this team: - Pulsed capacitors charged, high stored energy. - High Voltage absolute respect of security rules. AB-PO Review - 02.11.2005 J.P. Royer AB-PO-PH