1 / 5

ACS 560 Microblog 911 Project Status

ACS 560 Microblog 911 Project Status. Kassie M. Bowman September 27, 2011. Vision Document. Key User Needs. Application Architecture. Axiomatic Design. Design Matrix. Software Requirements Specification. Completed: Section 1: Introduction Section 4: Change Management Process

Download Presentation

ACS 560 Microblog 911 Project Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ACS 560Microblog 911Project Status Kassie M. Bowman September 27, 2011

  2. Vision Document • Key User Needs

  3. Application Architecture

  4. Axiomatic Design • Design Matrix

  5. Software Requirements Specification • Completed: • Section 1: Introduction • Section 4: Change Management Process • Section 5: Document Approvals • In progress: • Section 2: The Overall Description • Section 3: Specific Requirements

More Related