40 likes | 147 Views
WIRE PROJECT POG Notes. Spacing Is Critical!: Watch The Spacing On The POG To Assure Accuracy! If Needed, Page 2 Has Beam Heights As Measured From The Floor To Each Beam Beams: Be Sure That Base Beams Are Installed Where The POG Calls For Base Beams
E N D
WIRE PROJECT POG Notes • Spacing Is Critical!: • Watch The Spacing On The POG To Assure Accuracy! • If Needed, Page 2 Has Beam Heights As Measured From The Floor To Each Beam • Beams: • Be Sure That Base Beams Are Installed Where The POG Calls For Base Beams • Beam Size Is Important As Most Of These Bays Are Packed Tight. Be Sure To Use The Right Beam Sizes In The Right Locations/Bays Base Beam No Base Beam
WIRE PROJECT POG’s & SPECIFIC BAY ID #’s Bay 1 – 44-008 Bay 2 – 44-010 Bay 3 – 44-012 Bay 4 – 44-011
WIRE PROJECT POP • POP Is Basic……..Just Beam Labels • Be VERY Careful & VERY Specific That The POP Labels Are Installed Underneath The Correct Product! • Ask! Never Guess!
WIRE PROJECT Buy Back There Is A Buy Back For Existing Product – More Info To Come There Is Also New Product – More Detail To Come Including Tracking