LDA, TB, DESY Meeting. ATCalMZ Montagsmeeting. 25.02.2013. CCC-Hardware. Small hardware-bug fixed. 30 HDMI-Connector. 2. LDA-Hardware. Wrote mails to PCB manufacturers Got some feedback how I can design the PCB with there specifications. 3. LDA-Hardware. Left-Wing (paused).
E N D
LDA, TB, DESY Meeting ATCalMZ Montagsmeeting 25.02.2013
CCC-Hardware • Small hardware-bug fixed 30 HDMI-Connector 2
LDA-Hardware • Wrote mails to PCB manufacturers • Got some feedback how I can design the PCB with there specifications 3
LDA-Hardware • Left-Wing (paused) 30 HDMI-Connector 99mm 382mm 4
LDA-Hardware • Middle-Board (paused) 30 HDMI-Connector 99mm 390mm 5
LDA-Hardware • Daughter-Module (paused) FPGA FPGA FPGA FPGA RJ45 80mm MARS SD HDMI-CCC 280mm 6
LDA-Hardware • PIN allocation “ready” 7
LDA-HardwareProblems • Normally 48 layers in one HCAL segment 96 HDMI connectors for LDA, but… • After counting… • 38 layers? 8
LDA-HardwareProblems • But in the TB only space for 45 HCAL layers 90 HDMI connectors for LDA • lenght 114,4cm • not 110cm • 26mm gap betweeneach HDMI in the TB 9
LDA-HardwareProblems 26mm gap betweeneach HDMI in the TB 10
LDA-HardwareProblems • Scheduledforthe end of May TB are 8(12) layers (so noproblemwith 26mm LDA) • Scheduledforthenextbig TB are 38 layers(so noproblemwith 26mm LDA?), ifit‘sthisstructure 11
LDA-Software • Started programming TCP-IP-VI routine for LabView over Ethernet to talk with the LDA 12
Timeplan • Finish the DPG-talk – 1 day • Finish the LDA within 3 weeks after everything is clear • Finish the LabView LDA TCP-IP program – 2 days 13
DESY MeetingThursday 21.02.2013 • Hardware discussion (DESY-people) • Political discussion (DESY, LLR and Roman) 14
DESY MeetingThursday 21.02.2013 • Hardware discussion (DESY-people) 15
DESY MeetingThursday 21.02.2013 • Political discussion (DESY, LLR and Roman) • Rémi and Frédédric showed there DAQ (nice and very clear) • The goal is, come together HCALECAL in the EUDAQ • Resume of a long long discussion… • LLR won‘t support anybody of the CALICE group • CALICE group is just before collapse (Jean Claude) • Over 2 years no help no help for others (Jean Claude) • But you can come to LLR to have a look and we’ll support you through mails??? 16