1 / 16

LDA, TB, DESY Meeting

LDA, TB, DESY Meeting. ATCalMZ Montagsmeeting. 25.02.2013. CCC-Hardware. Small hardware-bug fixed. 30 HDMI-Connector. 2. LDA-Hardware. Wrote mails to PCB manufacturers Got some feedback how I can design the PCB with there specifications. 3. LDA-Hardware. Left-Wing (paused).

xerxes
Download Presentation

LDA, TB, DESY Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LDA, TB, DESY Meeting ATCalMZ Montagsmeeting 25.02.2013

  2. CCC-Hardware • Small hardware-bug fixed 30 HDMI-Connector 2

  3. LDA-Hardware • Wrote mails to PCB manufacturers • Got some feedback how I can design the PCB with there specifications 3

  4. LDA-Hardware • Left-Wing (paused) 30 HDMI-Connector 99mm 382mm 4

  5. LDA-Hardware • Middle-Board (paused) 30 HDMI-Connector 99mm 390mm 5

  6. LDA-Hardware • Daughter-Module (paused) FPGA FPGA FPGA FPGA RJ45 80mm MARS SD HDMI-CCC 280mm 6

  7. LDA-Hardware • PIN allocation “ready” 7

  8. LDA-HardwareProblems • Normally 48 layers in one HCAL segment  96 HDMI connectors for LDA, but… • After counting… • 38 layers? 8

  9. LDA-HardwareProblems • But in the TB only space for 45 HCAL layers  90 HDMI connectors for LDA • lenght 114,4cm • not 110cm • 26mm gap betweeneach HDMI in the TB 9

  10. LDA-HardwareProblems 26mm gap betweeneach HDMI in the TB 10

  11. LDA-HardwareProblems • Scheduledforthe end of May TB are 8(12) layers (so noproblemwith 26mm LDA) • Scheduledforthenextbig TB are 38 layers(so noproblemwith 26mm LDA?), ifit‘sthisstructure 11

  12. LDA-Software • Started programming TCP-IP-VI routine for LabView over Ethernet to talk with the LDA 12

  13. Timeplan • Finish the DPG-talk – 1 day • Finish the LDA within 3 weeks after everything is clear • Finish the LabView LDA TCP-IP program – 2 days 13

  14. DESY MeetingThursday 21.02.2013 • Hardware discussion (DESY-people) • Political discussion (DESY, LLR and Roman) 14

  15. DESY MeetingThursday 21.02.2013 • Hardware discussion (DESY-people) 15

  16. DESY MeetingThursday 21.02.2013 • Political discussion (DESY, LLR and Roman) • Rémi and Frédédric showed there DAQ (nice and very clear) • The goal is, come together HCALECAL in the EUDAQ • Resume of a long long discussion… • LLR won‘t support anybody of the CALICE group • CALICE group is just before collapse (Jean Claude) • Over 2 years no help  no help for others (Jean Claude) • But you can come to LLR to have a look and we’ll support you through mails??? 16

More Related