Status: CCC, LDA ATCalMZ Montagsmeeting 29.04.2013
Vidyo-Meeting: • 11th April 10:30 o’clock • About the CCC and TLU upgrades • David Cussans will give us the TLU VHDL code, so “easy” implementing • Two possibilities: • Baseline software or fallback hardware(or switched) • Timeline July 2013 AIDA Meeting 7
Rouven and I • 22.04.-24.04 • CCC worksgreat after onebigissue. • 50MHz insteadof 40MHz clock • 3 Layer-Readoutworkswithour CCC andour Fan-Out CCC DESY Support 5
Rouven and I CCC DESY Support 5
Passive PCB: 1. Wing with 32 HDMI connectors (almostfinished): LDA Layout 99mm 367,5mm 1
Passive PCB: 2. Central module with 32 HDMI connectors (almost finished): LDA Layout 99mm 365mm 2
LDA Layout Active PCB: 3. Daughter module: FPGA FPGA FPGA FPGA RJ45 80mm MARS SD HDMI-CCC 300mm 3