An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RHIC Status of pp Run11 Haixin Huang Time Meeting 01/04/2011

  2. Critical Systems • AGS is robust to deliver 60-65% polarization with 1.5*1011 • AtR: beam has been dumped into W dump. • Ramp System • Tested successfully. • Two ramps in hands: one regular one and one with D’ shifted down • RHIC Injection • Switching between 9/28MHz cavities is expected to be smooth • RHIC CNI polarimeters • Dry run for down stream polarimeter has finished. Test run for upstream polarimeter will happen tomorrow. • Tune/orbit feedback on the ramp • Tune feedback is successful, orbit feedback will require beam for further test. The feedback system is expected to be ready for the first ramp.

  3. Schedule • Jan. 3-9 Cryo cool down, not much beam activity is expected, just a few owl shifts over the weekend. • The most optimistic estimate is to start beam setup in blue Friday night. Power supply work will take two shifts per day for the weekend, probably also first a few days next week. • The 9AM meeting will start on Friday. • The 3:30PM meeting for beam development will start when we have beam time during day time.