1 / 2

SPRING TERM 2010

SPRING TERM 2010. 12.5 KM CROSS COUNTRY ROUTE AUTUMN TERM 2010. CP214. CP1/14. SP. FP. CP3. CP13. CP4. CP5. CP12. CP6. CP11. CP7. CP10. CP8. CP9. WATER PT (3) EVACUATION POINT (6). CP1/14- PASHAN ROAD T JUNCTION AFTT ROAD CP2- MT CROSSING CP3- RIGHT OF POLO FIELD ON PERIPHERY

xerxes
Download Presentation

SPRING TERM 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SPRING TERM 2010

  2. 12.5 KM CROSS COUNTRY ROUTE AUTUMN TERM 2010 CP214 CP1/14 SP FP CP3 CP13 CP4 CP5 CP12 CP6 CP11 CP7 CP10 CP8 CP9 WATER PT (3) EVACUATION POINT (6) CP1/14- PASHAN ROAD T JUNCTION AFTT ROAD CP2- MT CROSSING CP3- RIGHT OF POLO FIELD ON PERIPHERY RD JUNCTION POLO FDS CP4- ROAD JOINING FROM POLO FIELDS CP5- D3 AREA FIRST JN CP6- D3 AREA SECOND JN CP7- AHIRE VILLAGE JN CP8- DOUBLE STORAGE BLD CP9- D2 CIRCLE CP10- SWM POOL NO 1 JN CP11-ASHOKA PILLER CP12-GOLE MARKET CP13-POWER HOUSE

More Related