An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 29th Quarterly Review Meeting of Finance Controllers-SSA 12th – 14th May 2011 - Shimla ( Himachal Pradesh) PRESENTATION ON FIELD VISIT TEAM - III

  2. Team consisted of Finance Controllers of the States: Arunachal Pradesh, Chandigarh, Gujarat, J & K, Karnataka, Madhya Pradesh, Punjab, Rajasthan, Uttar Pradesh and Chief Consultant, TSG, Delhi • Finance Controller, SSA Rajasthan – Team Leader • Assisted by Shri Tilak Raj Chaudhary, SO / F & A and Shri Ashok Sharma, BRC / Primary • Team visited - BRC Office, Shimla, May Field, GPS/GSSS, Phagli, Chaura Maidan

  3. BRC Shimla • Cash Book maintained but not properly. • Saving Bank Account in UCO Bank. • Pass Book updated 4th May, 2011. • Cheque Issue Register not maintained. • Asset Register not maintained. • Vouchers are kept loosely in a file without defacement. • Bank Reconciliation is not carried out. • Accounts of BRC not yet covered in internal audit.

  4. Contd…. • No Account personnel at BRC level. • Training in maintaining of Books of Accounts is needed.

  5. Govt. Sr. Sec. School (Phagli) • Enrolment 153 from Class-VI to VIII. Consists of 46 SC girls and 48 SC boys. • There are 22 teachers (5 males and 17 females). • Cash Book is being maintained in double entry system but not properly. Cash Book is not closed periodically. • Ledger is maintained but not the Journal. • Cheque Issue Register is not maintained. • Advanced Register is not maintained. • Bank Account is being maintained in Cooperative Bank with a closing balance of Rs. 11421.00 as on 17.05.2010.

  6. Contd…. • Updation of Pass Book is required. • Saving Bank Account in Cooperative Bank needs to be closed immediately. • Vouchers are kept in a file. • Stock Register and Asset Register not maintained properly. • Physical verification not done.

  7. Govt. Primary School (Phagli) • There is an enrolment of 125 students in the cluster consisting of 42 SC boys and 53 SC girls (Phagli 73, Nobha 25 and Ramnagar 27). • Cash Book is maintained but not in a chronological order. • Cheque Issue Register not maintained. • Stock Register, Asset Register and Advance Register are not maintained.

  8. Govt. Primary School (Chaura Maidan) • There is an enrolment of 69 students. • There are 3 teachers. • Cash Book is maintained properly and timely updated and verified by the Head Teacher. • SMCs minutes register is available. • Stock register is maintained.

  9. Govt. Sec. School (Chaura Maidan) • Cash Book not prepared properly and not closed even on yearly basis. • Ledger is maintained. • Asset Register, Cheque Issue Register not maintained.