1 / 1

Iterative Process for Reasonable Further Progress Toward Attainment

At predetermined periods after implementation (i.e., milestone years), evaluate air quality against NAAQS. 3. Determine reason; is a mid-course correction needed?. Redesignation/ maintenance plan. Attainment achieved?. 6. Determine if area met the RFP targets: administrative test

yael
Download Presentation

Iterative Process for Reasonable Further Progress Toward Attainment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. At predetermined periods after implementation (i.e., milestone years), evaluate air quality against NAAQS 3 Determine reason; is a mid-course correction needed? Redesignation/ maintenance plan Attainment achieved? 6 • Determine if area met the RFP targets: • administrative test • emission reduction test • (+ = pass test) • (- = fail test) Assess available air quality indicators -- are they consistent with RFP test results? Determine reason; catch up on emission reductions or trigger contingency 4d Catch up on implementation; trigger contingency; penalties 4c • SIP Development • model to identify emission reductions needed for each pollutant • identify air quality indicators that can be used to help select • emission reductions targets • determine control strategy options • consider technical feasibility, cost-effectiveness, public acceptance • select optimal strategy and complete attainment demonstration • identify RFP targets for administrative/emission reduction tests • develop contingency measures (as available) Pre-SIP RFP Activities Iterative Process for Reasonable Further Progress Toward Attainment SIP Implementation 2 1 Yes No Yes No + administrative + emission reduction Continue implementation; rewards? 4a Yes No - administrative + emission reduction 4 Catch up on implementation 4b 5 + administrative - emission reduction - administrative - emission reduction 7/16/97

More Related