IEEE 802.11mc Closing Report for Nov ember 2013

IEEE 802.11mc Closing Report for Nov ember 2013. Authors:. Date: 2013-11-14. Abstract. This document contains the TGmc closing report for Nov ember 2013. Began processing comments received in LB 199 – First recirculation LB 497 comments

yank
Download Presentation

IEEE 802.11mc Closing Report for Nov ember 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEEE 802.11mc Closing Report forNovember 2013 Authors: Date:2013-11-14 Dorothy Stanley (Aruba Networks)

  2. Abstract This document contains the TGmc closing report for November 2013. Dorothy Stanley (Aruba Networks)

  3. Began processing comments received in LB 199 – First recirculation LB • 497comments • Approved resolutions to approximately 180 comments • Heard additional presentations (11ad fixes) • Discussed “deprecation” comments • Phased Coexistence Operation – decision to mark as obsolete. • Dual CTS/beacon Mechanism – decision to deprecate • (portions of)11b - No decisions this meeting; Presentations, motions on in Jan 2014 meeting, Weds PM1 Status Dorothy Stanley (Aruba Networks)

  4. TGmc Plan of Record (to be revised) 20 July 2012 – 12 Sept 2012 – Call for Comment/Input 29-30 Aug 2012 – NesCom, SASB PAR Approval Sept 2012 – Begin to process input Sept 2012 – 11aa, 11ae integration Jan – First WG Letter ballot - without 11ad Dec 2012 – March/May 2013 – 11ad integration – Sept 2013 – Letter ballot on D2.0 Dec 2013 – March 2014 – 11ac integration Letter Ballot on D3.0 (includes 11ac) March 2014 Feb 2014 – Mandatory Draft Review Feb-March 2014 – Form Sponsor Pool (45 days) April/May – Initial Sponsor Ballot TBD – integration of additional completed amendments (e.g. 11af) Integrate after initial SB Nov 2014 – WG/EC Final Approval March 2015 – RevCom/SASB Approval Slide 4 Dorothy Stanley (Aruba Networks)

  5. Conference Calls 10am Eastern (2 hours) • December 6, 13, 20 • January 10, 17 Teleconferences Dorothy Stanley (Aruba Networks)

  6. Comment Resolution of comments received from LB 199 on P802.11REVmc D2.0 Next Steps Dorothy Stanley (Aruba Networks)