1 / 21

Federal Acquisition of Architecture, Engineering and Related (A/E) Services

Federal Acquisition of Architecture, Engineering and Related (A/E) Services. Roundtable Discussion with OFPP Administrator Dan Gordon May 25, 2010 Washington, DC. Topics for Discussion. A/E Acquisition Workforce QBS – Definition of Services GSA Federal Supply Schedule Design-Build

yanni
Download Presentation

Federal Acquisition of Architecture, Engineering and Related (A/E) Services

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Federal Acquisition of Architecture, Engineering and Related (A/E) Services Roundtable Discussion with OFPP Administrator Dan Gordon May 25, 2010 Washington, DC

  2. Topics for Discussion • A/E Acquisition Workforce • QBS – Definition of Services • GSA Federal Supply Schedule • Design-Build • A-76, Insourcing & Inherently Governmental • Subcontracting

  3. Issue 1: Federal A/E Acquisition Workforce • There is a critical need to rebuild the Federal A/E acquisition workforce • Congress identified this issue in sec. 1414 of SARA • Implementation was insufficient and unsuccessful

  4. Federal A/E Acquisition Workforce • The lack of an adequate A/E acquisition workforce is resulting in corner-cutting in procurement that violates Brooks Act and compromises public health, safety and welfare • Manifestation • Narrowing of definition of A/E services using QBS • Misuse of GSA Schedule • Increased Use of Design-Build

  5. Discussion • How critical is the Federal government’s loss of a trained and experienced A/E acquisition workforce? • What is your experience (public or private sector) in dealing with the current workforce? • What can COFPAES, OFPP and other stakeholders do to help rebuild the Federal A/E acquisition workforce?

  6. Issue 2: A/E Definition • FAR was changed in (FAC 97-12), 1999, to revise the definition of A/E services in FAR Part 36 with regard to mapping • FAR Council comment on March 23, 2004 • Issued notice of no change on April 19, 2005 • Did not conduct legislative history, state licensing law analysis; rejected COFPAES appeal February 15, 2006 • COFPAES et al filed suit, April 6, 2006; dismissed for lack of standing

  7. A/E Definition • The April 19, 2005 Federal Register notice did not state that compliance with state licensing law was a factor in determining Brooks Act applicability • Agencies combine or “bundle” A/E services and non-A/E services, determine the contracts is not A/E “to a dominant extent”, and do not use QBS (FAR 36.6) • Agencies mistakenly believe the Brooks Act only applies to “design” services, or to “construction-related” services

  8. Discussion • What is your experience (public or private sector) in dealing with the application of the Brooks Act? • Does the FAR (36.6) need to be changed to assure proper compliance and implementation? • What can COFPAES, OFPP and other stakeholders do to help assure that public health, welfare and safety is being protected through use of QBS?

  9. Issue 3: Abuse of GSA Federal Supply/Multiple Award(FSS/MAS) Schedules • Multiple Award Schedule Advisory Panel Final Report • MAS Sales Data for FY 2008 • 871 Professional Engineering Services (PES) $2,766,067,166

  10. GSA Schedule • The Brooks Act, SARA and FAR prohibit price competition for A/E services (negotiation with the most qualified) • GSA hosts schedules that offer A/E services, as defined in Brooks Act and FAR part 36, with prices • PES facilitates firms offering Professional Engineering Services, without a license, in violation of State law • PES includes clearly understood A/E services • PES, IT, Environmental Services, MOBIS, Temporary (TAPS), Logworld and • Others permit firms to offer A&E professionals based on price

  11. GSA Schedule • GSA has denied COFPAES request to remove or rename these services from FSS • Legislation enacted to assure compliance with the law SARA (PL 108-136; sec. 1427(b)) • GSA still has A/E services on its FSS!

  12. Discussion • What is your experience (public or private sector) in dealing with the GSA Schedule for A/E contracts? • What can COFPAES, OFPP, GSA and other stakeholders do to help assure proper compliance and implementation?

  13. Issue 4: Design-Build • Authorized in Section 4105 of Federal Acquisition Reform Act (FARA) of 1995 • A-E Community is concerned D-B is being used more frequently than conventional design-bid-build • D-B results in pure price competition, no QBS for A/E phase • There has been no review of whether savings or efficiencies are being achieved • Community’s perception is that small firms are disadvantaged in the D-B process • There is a need to review the experience to determine if D-B is serving the public interest

  14. Discussion • What is your experience (public or private sector) in dealing with Design-Build? • Is Design-Build being used properly? • What is the impact on QBS, small business, and overall project quality and price? • Is there a need to review the Federal experience with Design-Build? • What can COFPAES, OFPP, GSA and other stakeholders do to help assure proper compliance and implementation?

  15. Issue 5: A-76, Insourcing & Inherently Governmental • A-76 is a non-binding circular • A&E listed as commercial activity • QBS process for A/E services is in statute (40 USC 1101) • Public-private cost comparison in circular • Conflict between statute and circular

  16. Issue 5: A-76, Insourcing & Inherently Governmental • The Bush A-76 revision for first time recognized A-76/QBS conflict • Provisions, such as the Van Hollen amendment, return to price competition • A/E services are being insourced, despite being commercial • Proposed inherently governmental definition could adversely affect the A/E community

  17. Issue 5: A-76, Insourcing & Inherently Governmental • COFPAES supports a core in-house A/E workforce, but opposes government competition • Concerns: • Functions that are closely associated with the performance of inherently governmental functions. “16. Construction of buildings or structures intended to be secure from electronic eavesdropping or other penetration by foreign governments” • “For ongoing contracts, agencies should review how work is performed, focusing, in particular, on functions that are closely associated with inherently governmental activities and professional and technical services …”

  18. Discussion • How should commercial activities and inherently governmental functions be defined with regard to the A/E community? • How should decisions be made on whether/what A/E activities are performed in-house and by contract? • How can QBS be preserved in any A-76 or similar public-private comparison/ competition?

  19. Issue 6: Subcontracting • Significant A/E work is done through teams with specialty subcontractors of small firms • SF 294-295 not aggregated or measured; Federal government has no system to measure subcontracting activity • Lack of system particularly hurts small businesses, who are typically subcontractors • Lack of system fails to accurately reflect small business participation in Federal contracting • Subcontracting reporting system needed (was in SBCDP but repealed)

  20. Discussion • Does current policy and practice hinder the private or public sectors, with regard to small business and subcontracting? • How can subcontracting in the A/E field be measured to accurately reflect the extent of small business participation?

  21. COFPAES1856 Old Reston Ave., Suite 205Reston, VA 20190John M. Palatiello, Administrator(703) 787-4748www.cofpaes.orgjohn@cofpaes.org

More Related