1 / 6

The Contemporary Home Collection

The Contemporary Home Collection. The Contemporary Home Collection.  High efficienc y wat er heat ers  Energy Star labeled exhaust fans  Rough-in radon protection  No added urea f ormaldehyde OSB and casework components  Low or no VOC adhesives, paints and caulks

yaphet
Download Presentation

The Contemporary Home Collection

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Contemporary Home Collection

  2. The Contemporary Home Collection  High efficienc y water heat ers  Energy Star labeled exhaust fans  Rough-in radon protection  No added urea f ormaldehyde OSB and casework components  Low or no VOC adhesives, paints and caulks  Energy efficient thermal envelope  Carbon monoxide monitors each floor  Energy Star lighting package  High performance Energy Star rat ed windows  Dramatically reduced on-site waste and minimal plant waste. • green construction process includes: •  Recycled program and was te elimination • programs used in the plant •  High efficienc y plumbing fixtures •  Efficient water distribution designs •  Indoor fabrication of modular units •  No tropical woods •  Environmentally preferable products •  Enhanced framing techniques used in plant • construction •  Installation of ERV system •  Zoned, not-ducted HVAC s ystems

  3. http://www.guerdonmodularbuildings.com/video/green_video.htmlhttp://www.guerdonmodularbuildings.com/video/green_video.html

  4. Harbour Landing Apartments

  5. Harbour Landing Apartments • Project Experience Highlights: •  Installation of the modular units is managed onsite by Guerdon and Guerdon’s on-site installation contractors. •  Site work and plant construction began in 4th Quarter 2010. By the end of January 2011, the first of 6 buildings were dried-in. The target date for the first building’s Certificate of Occupancy is April 2011. •  Working with extremely cold climate conditions, the team’s in-depth knowledge of modular construction and its diligent work ethic were clearly demonstrated with this project. •  Guerdon’s scope of work included the installation and structural connections of the building, close-up for weather protection, framing and decking of the drop-in corridor floors,

  6. http://www.guerdonmodularbuildings.com/video/harbour_video.htmlhttp://www.guerdonmodularbuildings.com/video/harbour_video.html

More Related