An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transmission Congestion Management – IDC Granularity Option 3A Larry Kezele and Jeff Norman June 28, 2005 NERC/NAESB TLR Subcommittee

  2. Summary of Responses to NERC’s Request for Information (RFI) ---- Selection of a Next Generation Transmission Congestion Management Tool (IDC Granularity Option 3)

  3. ABB AREVA T&D ICF Consulting MCG (Minneapolis Consulting Group) Nexant – Energy Solutions Division OATI (Open Access Technology International) PowerWorld SunGard Enform Consulting Respondents

  4. Overview of Responses • Submitted as confidential and contain proprietary information • Implementation of Granularity Option 3A is technically feasible – (i.e. similar technology implemented in RTO/ISO market areas) • Phased implementation is possible, minimizing resource commitment • Respondents have a variety of experience in the electric industry, and most have experience in financial markets

  5. Projected Cost and Development Time • $ 2 – 10 Million • Clear definition of project scope and requirements impacts projected cost • Multi-year service agreement acceptable • “Forklift” IDC replacement project • One to two year implementation time line • Customized development, or • Customized development of Application Program Interface modules to commercially available systems

  6. System Security • Digital Certificates required • User names and passwords • Adherence to NERC cyber security standards

  7. Data Requirements • Common practice among vendors is to accept third party data • Near real time data to support security constrained economic dispatch (5-minute intervals) • System flow and loads • Generator outputs, ramp rates, capacity limits • Existing data structures may be adequate • Create data dependency that doesn’t exist today • Acquisition and definition of financial data?

  8. Implementation Concerns • Staffing and training • Paradigm shift in transmission congestion management • Risk related to resolution of congestion management process issues in parallel with tool implementation • Critical project success factor – Controlled scope

  9. Definition - Project Scope and Requirements • Implementation of supporting Business Practices • Option 3 provides for socialization of congestion costs to balancing authorities • Option 3A assigns congestion costs to contributing transactions and balancing authority load • PSEs may chose to curtail based on assignment of redispatch costs • Reservation and scheduling of redispatch energy

  10. Definition - Project Scope and Requirements • Implementation of supporting Reliability Standards • Inclusion of counterflows • Potential re-definition of the role of the NERC Reliability Coordinator • Reliability Coordinator Standards of Conduct (i.e. independence from market participants)

  11. Definition - Project Scope and Requirements • Definition of Financial Model(s) • Generator bid/offer system (i.e. bidding rules) • Settlements • Dispute resolution • Compliance with redispatch directives • Financial requirements for redispatch providers

  12. Definition - Project Scope and Requirements • Potential impacts to System Reliability • Delays in redispatch implementation (e.g., by allowing a PSE to decide at what financial threshold it is willing to accept redispatch costs) may actually compromise reliability.

  13. Definition - Project Scope and Requirements • Potential impacts to other NERC tools • E-tag specification • OASIS (redispatch transaction transmission service) • System Data Exchange • BA, TOP, PSE back end settlement systems

  14. Definition - Project Scope and Requirements • Potential impacts to non-NERC tools • BA, TOP, PSE back end settlement systems • Provision of supporting data • RTO/ISO market flow calculators

  15. Definition - Project Scope and Requirements • Regulatory Obstacles • Potential transmission tariff changes • State and Federal approvals required to allow participation in regional redispatch tariffs

  16. Definition - Project Scope and Requirements • Sarbanes-Oxley Compliance • Market participants subject to SAS 70 auditing requirements. • Extensive data retention requirements