80 likes | 257 Views
DCC Phase 2 with Hangars Overview. Site Plan. Layout After Phase 1. Phase 2 – Funded by Airport – 2008 Loan. 1. 2. Phase 2 – Funded by FedEx – Date Unknown (Fall 2008?). FE. 1. 2. Phase 2 – FAA Funding. FE. 1. 2. 500’. Phase 2 – Final Layout. FE. 1. 2. 500’. CBP. Phase 3
E N D
DCC Phase 2 with Hangars Overview • Site Plan
Phase 2 – Funded by FedEx – Date Unknown (Fall 2008?) FE 1 2
Phase 2 – FAA Funding FE 1 2 500’
Phase 2 – Final Layout FE 1 2 500’ CBP Phase 3 Phase 4 Etc