History of Ht Mod Leveling in Minnesota • Planned to start leveling in 1996 to the Minnesota HARN’s that did not have a previous 1st or 2nd order published benchmark. • Project never really got going (personnel changes). • Started up again in 2000 after phone call to NGS. • All 603 HARN marks (100%) have been leveled to 2nd order Class I or better. • 119 RTN/CORS sites leveled to or near. Natl Ht Mod Partners Mtg - Frankfort, KY
All 603 HARNS Natl Ht Mod Partners Mtg - Frankfort, KY
History of Height Mod GPS (horizontal) work in MN • HARN • Started county densification in 2000 after phone call with NGS. • FBN • CBN • NAD 83(2007) adjustment • NAD83 (2011) adjustment Natl Ht Mod Partners Mtg - Frankfort, KY
County partnerships • 61 out of 87 counties (70%) completed • If a county wanted to partner most completed a 3 mile grid spacing. • If a county declined to partner, MnDOT completed the county at a 6 mile grid spacing. • Current rate of completion is 3-4 counties per year. • Should be complete in 7-8 years. Natl Ht Mod Partners Mtg - Frankfort, KY
County Partnership status - Horizontal Natl Ht Mod Partners Mtg - Frankfort, KY
County Partnership status - Vertical Natl Ht Mod Partners Mtg - Frankfort, KY
History of Height Mod funding for leveling in Minnesota Started utilizing consultants for Height Mod leveling in 2004 with MnDOT funds. MnDOT NGS FY2005 $ 197,000 $ 0 FY2006 $ 674,500 $ 0 FY2007 $ 989,000 $ 0 FY2008 $ 296,000 $ 0 FY2009 $ 895,000 $ 80,000 (Grant awarded) FY2010 $ 300,000 $ 0 FY2011 $ 642,000 $ 0 FY2012 $ 1,040,000 $ 0 FY2013 $ 1,000,000 $ 0 Total consultant-performed leveling to date $ 6,113,500 Total Mn/DOT-performed leveling to date $ (equal or greater than consultants) Natl Ht Mod Partners Mtg - Frankfort, KY
Minnesota VRS/CORS • 119 of 131 VRS/CORS stations leveled to. • Of the remaining to be leveled • 1 in Minnesota • 2 in South Dakota • 9 in Iowa • Of the 110 submitted, 61 have been accepted into National CORS. • Final total of 140 VRS/CORS by 2018. • Fill in gaps, holes to improve coverage. Natl Ht Mod Partners Mtg - Frankfort, KY
CORS status in Minnesota as of October 2012 Natl Ht Mod Partners Mtg - Frankfort, KY
Minnesota CORS accepted in National CORS - April 2013 Natl Ht Mod Partners Mtg - Frankfort, KY
NGS Backlog of Minnesota Projects • As of December 2012 • 136 vertical projects • 6 horizontal projects • 39 horizontal projects to be adjusted at MnDOT • Concerns about trivial vectors with NGS • MnDOT looking into processing in PAGES • 61 of 110 submitted CORS to NGS accepted into National CORS. Awaiting acceptance of remaining 49 CORS submitted. Natl Ht Mod Partners Mtg - Frankfort, KY
Height Modernization Stations Natl Ht Mod Partners Mtg - Frankfort, KY
Minnesota Horizontal Order A, B & C marks Natl Ht Mod Partners Mtg - Frankfort, KY
Minnesota Vertical 1st and 2nd order Natl Ht Mod Partners Mtg - Frankfort, KY
Minnesota 3D marks • Have both Horizontal • A, B, or C • And Vertical • 1/1, 1/2 or 2/1 Natl Ht Mod Partners Mtg - Frankfort, KY
MN Level Net as of 1991 This represents the data set that was adjusted to become NAVD88 Natl Ht Mod Partners Mtg - Frankfort, KY
MN Leveling Added Since 1991 These new leveling campaigns have proven that many 4-8 cm height biases exist in NAVD88. Natl Ht Mod Partners Mtg - Frankfort, KY
MN Level Net as of 2013 Minnesota would like to see a new regional (MN/WI) adjustment of all leveling to date constrained to the National CORS and to surrounding states (IA/SD/ND). Natl Ht Mod Partners Mtg - Frankfort, KY
Future of Height Mod in Minnesota • 5 year plan • Complete leveling of all state roads. • Re-level vertical control surveys performed before 1980 (> 30 years old). • Move and re-level vertical control marks within 50 foot of railroad tracks – (safety). • Continue to “blue book” horizontal and vertical surveys. • Continue county densifications for the entire State of Minnesota on 6 or 3 mile grid spacing. • Continue to incorporate Wisconsin’s RTRN system with Minnesota’s RTRN. Natl Ht Mod Partners Mtg - Frankfort, KY
Uncertain Future of Height Mod in Minnesota • 5 year plan • Waiting for guidance on gravity measurements. • Additional ground based measurements needed? • Waiting for OPUS PROJECTS to be implemented. • Stop the “bluebook” submittal process. • Waiting for National vertical adjustment based on National CORS system. • Waiting for vertical backlog at NGS to get out of the triple digits for Minnesota (136 as of December 2012) Natl Ht Mod Partners Mtg - Frankfort, KY
How MN Gets It Done Natl Ht Mod Partners Mtg - Frankfort, KY
Questions or comments Contact: Richard E. Morey, Assistant Office Director John R. Barke, Geodetic Engineer David A. Zenk, Geodesist/State Geodetic Advisor The Minnesota State Fish – the Walleye Open Season begins May 11, 2013 Natl Ht Mod Partners Mtg - Frankfort, KY