1 / 44

20to2T5m120cm4pDL Concept Update

20to2T5m120cm4pDL Concept Update. Van Graves June 6, 2014. This page is a single image, not editable. This page is editable. 15 T superconducting coil outsert , Stored energy ~ 3 GJ , ~ 100 tons. Proton beam tube. Last Final-Focus quad. Upstream proton beam window.

yeva
Download Presentation

20to2T5m120cm4pDL Concept Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 20to2T5m120cm4pDL Concept Update Van Graves June 6, 2014

  2. This page is a single image, not editable

  3. This page is editable 15 T superconducting coil outsert, Stored energy ~ 3 GJ, ~ 100 tons Proton beam tube Last Final-Focus quad Upstream proton beam window Target/dump vessel 5 T copper-coil insert, Water-cooled, MgO insulated He-gas-cooled W-bead shielding (~ 100 tons)

  4. This page is a single image, not editable

  5. This page is editable 15 T superconducting coil outsert, Stored energy ~ 3 GJ, ~ 100 tons Proton beam tube Last Final-Focus quad 2nd magnet module, 5 SC coils Be window, r = 23 cm Upstream proton beam window Target/dump vessel 5 T copper-coil insert, Water-cooled, MgO insulated He-gas-cooled W-bead shielding (~ 100 tons)

  6. This page is editable 15-T superconducting coil outsert, Stored energy ~ 3 GJ, ~ 100 tons Proton beam tube 2-T magnet modules, 6 coils, 5-m long, 23-cm-radius bore Transition magnet module, 5 coils, 5 m long, 2-T final field Last Final-Focus quad Upstream proton beam window He-gas cooled W-bead shielding (~ 100 tons/module) 5-T copper-coil insert. Water-cooled, MgO insulated

  7. Z=0

  8. Z=0

  9. Z=0

  10. 2nd magnet module

  11. 3rd magnet module

  12. y z

More Related