1 / 13

Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

SC C2 – System Operation and Control. SC website: www.cigre-c2.org. Presidente: Michel Armstrong (CA) Segretario: Ben – Li (CA). Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

yeva
Download Presentation

Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SC C2 – System Operation and Control SC website:www.cigre-c2.org Presidente: Michel Armstrong (CA) Segretario: Ben – Li (CA) Scopo • Controllo, regolazione F/P – V/Q , Montoraggio. • Congestion management, strategie per l’emergenza , riaccensione, interazione tra Sistemi di trasmissione e centrali, Short term operation planning and coordination bench-marking prestazioni dei Sistemi Elettrici. • Impatto sull’esercizio dei nuovi assetti istituzionali (TSO or ISO), della regolazione, dei meccanismi di Trading e del comportamento dei fornitori di servizi di rete. • Formazione degli operatori di sala (simulatori, indici di valutazione). • Security assessment, analisi di rete. • Membership • 32 Paesi rappresentati • 24 membri nazionali regolari + 12 membri nazionali osservatori • Utilities (25), Universities/Institutes (5), Regolatori (3) Altri (3). • Europe (20), Asia/Oceania (8), South/North America (5) and Africa (3). • Membro italiano: C. Sabelli(carlo.sabelli@terna.it)

  2. SC 2 – Risultati principali Parigi 2008 • Large Disturbances • 4 novembre “brown out in Europe”. Descrizione senza approfondimento delle cause di fondo (regolazione, disciplina degli scambi transfrontalieri, ecc.) • “Ice in Cina”. Descrizione • Florida: interessante per conseguenze di errori di gestione delle protezioni • Sud Africa: mancanza di margini (PESSE) • Terremoto in Giappone • Decisione di istituire un Gruppo “Lezioni Imparate” e Q&A Session • Poster Session • Principali Soggetti: • WAMS • Training Simulators • Restoration • Wind production integration • Riscontri: interesse per tutti gli argomenti, specialmente WAMS e Restoration

  3. SC 2 – Risultati principali Parigi 2008 • PS1: New applications in system operation and control for detection and mitigation of system conditions • WAMS. Tecnologia matura. Distribuzione dei PMU. Attività Terna e CESI riconosciute di livello • Security Assessment: riduzione del gap tra operation planning e real time control (stessi tool) • Selfhealing: nuovo approccio verso il rafforzamento della capacità di reazione dei sistemi elettrici, anche in considerazione della riduzione dei margini. • PS2: Evolution of operation reliability standards in the context of open markets and reduced security margins • Eolico: principale elemento da considerare in regime normale ed in emergenza • Formazione degli operatori: elemento ricorrente da ampliare in collaborazione con i Distributori ed i Produttori. Nuovi spunti per la gestione delle crisi. • PS3:Impact on system operation and control of the integration • of large wind generation • Focus sui metodi di previsione • Inportanza dei codici di rete in cui si richiede un maggior rigore nella specificazione di caratteristiche di ride throuh fault, regolazione , ecc.

  4. SC 2 - Working Group attivi [1] Type : Working Group (WG), Task Force (TF), Advisory Group (AG), Co-operation Group (CG), Joint Working Group (JWG), Joint Task Force (JTF), … [2] Number : identification number [3] Title : full title in English [4] Name : Initials NAME (2 letters for nationality) [5] Created : year of creation [6] Disbanded : scheduled year of disbanding

  5. SC C2 - Argomenti per nuove attività e futuri Working Groups JWG C1/C2/C6 Coping with Limits for High Penetration of Renewable Energy [Hugh Jones] Varato a di recente. Prima riunione a giugno 2008 per discutere il ToR. TC Project: Smart Grid WG che probabilmente riferirà direttamente al TC in quanto molti degli argomenti correlati interesseranno molti comitati. C2 si è reso disponibile alla partecipazione attiva.

  6. SC C2 – Pubblicazioni più recenti

  7. SC C2 – Prossime riunioni ed Eventi d’interesse • C1/C2/C5: Operation and Development of Power Systems in the New Context Guilin City - Guangxi Province, China. 28 - 30 October 2009 • A CIGRE/IEE PES Symposium - Integration of wide-scale renewable resources into Power delivery system, will be held July 29-31, 2009 in Calgary, Canada. C2 WG are invited to have their meetings during this event. • SC B4 will hold a Colloquium on June 11-12, 2009 in Bergen, Norway • International Symposium on expansion and operational planning in 2009 in Brazil. Mr. Gomes (ONS) riferimento per ulteriori dettagli. • An International Workshop on Electric Power Control Centers will be held in Dublin, Ireland on June 14-17, 2009 • International Conference on Deregulated Electricity Market Issues in South-Eastern Europe a September 17-18, 2009 in Belgrado, Serbia. • As usual, the CIGRE bi-annual Session will be held in Paris in 2010. • C2 2011 annual meeting –Malaysia, Indonesia and Brazil. Forse Brasile.

  8. Principali conclusioni • Cooperazioni principali. Con B2 e D2 • Connotato. Comitato “di Sistema” d’interesse del dispacciamento. Elevato contenuto specialistico. Scarsa interazione con i Costruttori. Limitata platea di potenziali membri. • Azioni. Ancora lente. Difficilmente al passo con i cambiamenti e con la regolazione.

  9. SC C2 -Soggetti preferenziali per la Sessione 2010 • a. Enhancement of Operating Reliability, including: • Impact of dynamic security assessment and dynamic ratings on real time system operations • Decision making tools and methods, system visibility; common format and quality of data for wide area modeling and assessment • Balancing resources within transmission constraint, including distributed generation • Impact of wind farm generation on transmission system Grid code • Consistency and Coordination of System Control and Operation, including: • Challenges/experiences/trends of coordinated operation among TSOs for interconnected system • Formulation and harmonization of operational reliability standards (criteria, performance indicators, compliance measures) • Impact of cross-border reliability regulatory aspects on system operation; issues on shared responsibilities in system operation and control between real time actors

  10. BACK UP

More Related