An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sector 29 PS SystemsStability Tests for LCLS Antonio de Lira Power Conversion Department May 25, 2005

  2. Sector 29 PS SystemsStability Tests for LCLS • Purposes: • Test a QE PS System over Sector 29 • Check PS Stability vs. time and temperature • Measure Boost PS stability at 10 A • Measure Buck PS stability at 20 A

  3. Sector 29 PS SystemsStability Tests for LCLS • Boost PS (Quad 501) under test • Data acquisition system: • Precision Zero-Flux Current Transducer (DCCT) • 61/2 precision multi-channel DVM Boost PS (Quad 501) Unit - 30V/20A

  4. Sector 29 PS SystemsStability Tests for LCLS • Bulk PS under test • Data acquisition system: • 300A/10V Precision Zero-Flux Current Transducer (DCCT) • 61/2 precision multi-channel DVM

  5. Sector 29 PS SystemsStability Tests for LCLS • Booster Quad 501 PS stability results • Mean: 10.004 A • Minimum: 9.995 A • Maximum: 10.013 A • Variation: 0.18 % • ∆ Temp. : 13.1 °C Note: Measurements taken on May 24, 2005

  6. Sector 29 PS SystemsStability Tests for LCLS • Booster Quad 501 PS Reference stability • Mean: 10.002 A • Minimum: 10.002 A • Maximum: 10.003 A • Variation: 0.01% • ∆ Temp. : 13.1 °C Note: Measurements taken on May 24, 2005

  7. Sector 29 PS SystemsStability Tests for LCLS • LGPS 1 (Bulk Quad) PS stability results • Mean: 20.546 A • Minimum: 20.478 A • Maximum: 20.592 A • Variation: 0.55 % • ∆ Temp. : 13.1 °C Note: Measurements taken on May 24, 2005

  8. Sector 29 PS SystemsStability Tests for LCLS • Next steps: • Measure Boost PS Stability at 20A • Measure the ripple of the Boost PS • Measure the current spectrum of the Boost PS • Measure the current monitor output signal out of the Boost PS • Measure the Bulk PS ripple and spectrum at 20A