1 / 20

Route 18 Median

Route 18 Median. Project Status Accident Data Comparison with Other State Routes Alternatives Next Steps. Overview. Project Study Report (Complete ) Project Report (Jan 2015) Environmental (Jan 2015) Design (June/2016) Construction (July 2017). Project Status.

Download Presentation

Route 18 Median

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Route 18 Median

  2. Project Status Accident Data Comparison with Other State Routes Alternatives Next Steps Overview

  3. Project Study Report (Complete) Project Report (Jan 2015) Environmental (Jan 2015) Design (June/2016) Construction (July 2017) Project Status

  4. Highway 17 Santa Cruz/Santa Clara County Highway 50 El Dorado County Highway 18 San Bernardino County Similar Highways

  5. HIGHWAY 17 dRIVE

  6. Highway 50 Drive

  7. Highway 18 Drive

  8. Route Comparison (Accident Rates) Highway 17 * Highway 50 * Highway 18 * = With Concrete Barrier

  9. Rainfall Comparison

  10. Cross Over Accidents Ten Year Data 4/1/02 - 3/31/12 - Fatal Collisions = 13 - Injury Collisions = 79 - Property Damage = 39 Total Collisions = 131 Fatalities = 16 Injuries = 157

  11. Concrete Barrier Metal Beam Guardrail Cable Barrier Delineators Reconfigure Lanes Alternatives

  12. Alternative - Concrete Barrier

  13. Alternative - Metal Beam Guardrail

  14. Alternative - Cable Barrier

  15. Alternative - Delineators

  16. Alternative – Reconfigure Lanes

  17. NO BUILD NO BUILD

  18. Review All Input Received Examine Effectiveness of Each Alternative Solicit Additional Comments from Stakeholders Install Delineators on Top Section of SR-18 September - Present Proposed Solution for Entire Route (Lake Arrowhead Disaster Meeting) Next Steps

  19. One Final Message Highway 62

  20. Questions ??

More Related