PROJECT STATUS. Existing Campus Demo No DSA permit required Project bids have been received. Apparent low bid = $2,148,000 (Evans Brothers) (total of 9 bids received ) Projected demolition start May, 2012 CCS DSA permit received for relocation into portable buildings at Downer School
E N D
PROJECT STATUS • Existing Campus Demo • No DSA permit required • Project bids have been received. Apparent low bid = $2,148,000 (Evans Brothers) (total of 9 bids received) • Projected demolition start May, 2012 • CCS • DSA permit received for relocation into portable buildings at Downer School • Project to bid mid-May • Anticipate construction complete August, 2012 • Portola at Castro • Main building permit received on 2/28/12 • Green Roof addendum under review at DSA • OPSC Funding – Plan verification currently reviewing: • Seismic • Modernization (Portola) • Modernization (Castro)
PORTOLA DEMO “FIELD”
PORTOLA DEMO NAVELLIER STREET “SIDEWALK” “FIELD” TEMP CAMPUS
MID-LEVEL ENTRY AND ACADEMIC
UPPER LEVEL ARTS / MULTI-USE
LIBRARY INSET = MPR