1 / 17

Township Supervisor Meeting

Township Supervisor Meeting. December 16, 2009. Patching 2009. Patching 2009. Patching 2009. Paser Road Ratings. Paser Ratings – Surface Evaluation 10 Excellent – new construction 9 Excellent – overlay 8 Very Good – recent overlay or sealcoat 7 Good – first sign of aging – crack seal

yon
Download Presentation

Township Supervisor Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Township Supervisor Meeting December 16, 2009

  2. Patching 2009

  3. Patching 2009

  4. Patching 2009

  5. Paser Road Ratings • Paser Ratings – Surface Evaluation • 10 Excellent – new construction • 9 Excellent – overlay • 8 Very Good – recent overlay or sealcoat • 7 Good – first sign of aging – crack seal • 6 Good – more aging – should sealcoat • 5 Fair – needs to be sealcoated

  6. Paser Road Ratings • Paser Ratings – Surface Evaluation • 4 Fair – needs strengthening – overlay • 3 Poor – needs patching and overlay • 2 Very Poor – needs reconstruction • 1 Failed – needs reconstruction

  7. Paser Road Ratings

  8. Paser Road Ratings

  9. Five Year Plan

  10. 2009 Patching $2,570,411.08

  11. Paser Road Ratings

  12. Five Year Plan • Every Road Needs A Plan • 1’s & 2’s – Reconstruction or Deconstruction • 3’s & 4’s – Paver Patching and Sealcoating • 5’s & 6’s – Sealcoating • 7’s & 8’s – Crack Sealing and Maintain Shoulders • 9’s & 10’s - Monitoring

  13. Paser Road Ratings

  14. 2010 Projects • Increase non MTF Sources • Federal Aid Projects • Verona Road – 12 Mile to 15 Mile • 6 ½ Mile – B Dr N to Christian • N Drive N – 15 Mile to 16 Mile • 11 Mile Road – Wheatfield Pkwy – Verona Rd • 22 Mile Road Bridge Over St. Joe River

  15. 2010 MTF Appropriation -6.0%

  16. The Blizzard of 2009 December 9, 2009 – December 14, 2009

  17. Thank You! While the news isn’t always positive – communication remains the key to our success. Only through collaborative efforts can we develop a long-term plan to address the improvements of roads throughout the County. Thanks for attending today’s Township Supervisor Meeting. I hope you all have a Happy & Safe Holiday Season! Kevin S. Henning Managing Director (269) 781-9841 ext 223

More Related