150 likes | 277 Views
FY14 Production Plan Status Brief EOM June 2014. Navy Enlisted Occupational Standards (NEOS) P01 FY14 Document Production (as of 30 Jun). Studies scheduled to start later in FY14: MA, ND.
E N D
FY14 Production Plan Status Brief EOM June2014
Navy Enlisted Occupational Standards (NEOS) P01 FY14 Document Production (as of 30 Jun) Studies scheduled to start later in FY14: MA, ND *Column totals include Last EOM / Current EOM, with column detail changes highlighted in Blue Italic.
Ship/Fleet Manpower Documents (SMD/FMD) P04 FY14 Production Status (as of 30Jun) Studies scheduled to start later in FY14: AEGIS ASHORE; CBMU; LCS 2; LPD 17 CLASS; DDG 1000; PC 1; PC MST; MDSU 1; MDSU 2; MCM 1 CLASS; MCMRON *Column totals include Last EOM / Current EOM, with column detail changes highlighted in Blue Italic.
Aviation Manpower Documents (SQMD/MRW) P04 FY14 Production Status (as of 30 Jun) 6 Studies scheduled to start later in FY14: VAW Class; VAW FDNF; HSC-21; HSC-23; HSC-25; CVN 75 Moved to FY15: CVN 68; *Column totals include Last EOM / Current EOM, with column detail changes highlighted in Blue Italic. ~ Not Previously Scheduled
MRD Program Administration P13 FY14 Production Status (as of 30 Jun) 1 – New consulting to Code 30 on near-term UAV modeling solution – Not holistic UAV Protocol for SQMDs 2 – Added and segregated to show uniqueness and independence of comparative analysis from R&D study *Column totals include Last EOM / Current EOM, with column detail changes highlighted in Blue Italic.
Manpower CCB AdministrationP14 FY14 Production Status (as of 30 Jun) *Column totals include Last EOM / Current EOM, with column detail changes highlighted in BlueItalic.
Afloat/Expeditionary MRD SupportFY14 Production Status (as of 30 Jun) *Column totals include Last EOM / Current EOM, with column detail changes highlighted in Blue Italic.
Aviation MRD SupportFY14 Production Status (as of 30Jun) • Acquisition Studies to start in FY14: E-2D; *Column totals include Last EOM / Current EOM, with column detail changes highlighted in Blue Italic.
Manpower Management Special TaskingP10 FY14 Production Status (as of 30 Jun) *Column totals include Last EOM / Current EOM, with column detail changes highlighted in Blue Italic.
NEOCS Classification Change Requests P02 FY14 Production Status (as of 30 Jun) *Column totals include Last EOM / Current EOM, with column detail changes highlighted in Blue Italic.
NOOCS Classification Change Requests P02 FY14 Production Status (as of 30 Jun) *Column totals include Last EOM / Current EOM, with column detail changes highlighted in Blue Italic.
Aviation Staffing StandardsP04 Production Status (as of 30Jun) Code 20 Methodology *Column totals include Last EOM / Current EOM, with column detail changes highlighted in Blue Italic. ~ Not Previously Scheduled
NAVMAC Production PlanNumber of Products/Services Produced 14