Production Status

Production Status. Kaushik De U.S. Facilities Meeting Aug 8, 2007. Production Statistics. Note: Change of metric from number of jobs to walltime. Issues. Production rate slow at MWT2 and AGLT2 last week All other sites doing well BU added more CPU’s

Download Presentation

Production Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Production Status Kaushik De U.S. Facilities Meeting Aug 8, 2007

  2. Production Statistics Note: Change of metric from number of jobs to walltime Kaushik De

  3. Issues • Production rate slow at MWT2 and AGLT2 last week • All other sites doing well • BU added more CPU’s • We are getting higher fraction from SLAC – periodically • Same at OU Oscer - periodically • Achieved many milestones during past week: • Panda crossed 3000 concurrently running jobs – the peak was ~3250 yesterday evening • Started production at UBC – over 300 running jobs yesterday • Started production at UTD Tier 3 – 152 new CPU’s • Thanks to all – sites, shifters, pandanistas! • More details in shifters report by Mark/Barry Kaushik De