CJK- IMT25-025. The 2nd 3GPP evaluation workshop. KITO , Eiji ( e-kito @ab . jp.nec.com ). Summary. Status Report from 9 IEGs ATIS, CEG, ChEG, ETSI, TCOE, TR-45, TTA PG707, WEFG, WINNER+ Final Evaluation Report will be expected from 8 IEGs
E N D
CJK-IMT25-025 The 2nd 3GPP evaluation workshop KITO, Eiji (e-kito@ab.jp.nec.com)
Summary • Status Reportfrom 9 IEGs • ATIS, CEG, ChEG, ETSI, TCOE, TR-45, TTA PG707, WEFG, WINNER+ • Final Evaluation Report will be expected from 8 IEGs • ATIS, CEG, ChEG, ETSI, TCOE, TR-45, TTA PG707, WINNER+ • No issues on the evaluation methodology and parameters • Simulation of 3GPP technology are on going by Some IEGs • All available results show 3GPP Technology meets the ITU requirements • The question from ATIS on ITU Forum was answered orally and the answer will be input to ITU Forum. • The following result were discussed and there was no critical issue. • Peak spectral efficiency, Cell spectral efficiency, Cell edge user spectral efficiency