An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team GeoMELT 05.08.2010

  2. The Team

  3. Outline • Project Introduction • Goals • Site Assessment • Design Norms • Final Design • Snowmelt • Geothermal • Pumphouse • Model • Project Cost • Conclusions • Acknowledgements • Questions

  4. Project Introduction Michigan receives ≈ 72 inches of snow annually Lake-effect snow can lead to severe storms, but Calvin never cancels class! http://www.duluthstreams.org/understanding/lake_effect.html

  5. Project Introduction • Problems with the Burton St. Entrance to Calvin • Why not use Geothermal energy to melt snow? http://www.bing.com/maps

  6. Introduction - Goals • Primary Goal: Design a geothermal snowmelt system at Calvin’s Burton Street Entrance • Secondary Goal: Design a small scale model

  7. Introduction - Design Norms • Stewardship • Save on energy and reduce fossil fuel use • Caring • Increase safety for pedestrians and vehicles • Transparency • Honest recommendation

  8. Introduction – Site Analysis http://www.bing.com/maps • Assess the existing site • Where to place the geothermal field? • How much pavement should we melt? • What obstacles do we have to work around? • Large trees? • Pipes? • Fiber Optic Lines?

  9. Introduction – Site Analysis • Existing Infrastructure • Pavement/Curb lines • Watermain • Gas main • Storm Sewer • Fiber Optic Line

  10. Snowmelt 101 How it works Results you get! • Pipes buried in concrete • Slip free surfaces • No need to shovel/plow

  11. Snowmelt 101 • Using the software program EES for Thermodynamics

  12. Snowmelt 101 • Temperature drives heat transfer! • 55 °F water • Ice formation

  13. Snowmelt Design • 4,000 ft2 to melt at 150 BTU/hr- ft2 • 60 tons ≈ 20 times the heat load of a house • 2 Manifolds are used to distribute heat to the snowmelt area http://www.bing.com/maps

  14. Snowmelt Design – Pipe Layout • 1” PEX pipe • 500’ length loops • 9” on center pipe spacing • 3” from concrete surface

  15. Geothermal Energy 101 • Ground temperature over a year at varying depths Kavanaugh, Stephen P., and Kevin Rafferty. Ground-Source Heat Pumps. Atlanta: ASHRAE, 1997. 125-26. Print.

  16. Geothermal Energy 101 • Pump fluid through buried pipes to extract energy http://focusedthinking.files.wordpress.com/2009/04/geothermal_heat_pump.jpg

  17. Geothermal Energy 101 Heat In Heat Out • Residual Temperature Effects • Balanced systems

  18. Geothermal Design • Horizontal vs. Vertical

  19. Geothermal Design • Calculated the total bore length required: 9375 ft • Which is approximately 1.75 miles • Limit each bore depth to 390 ft • Pipe diameter – 1 ¼” http://img.directindustry.com/images_di/photo-g/well-drilling-rig-354735.jpg

  20. Geothermal Design • 24 Well Locations • Adequate well spacing • 3 rectangular manifolds • Design avoids tree removal! • Pumphouse hidden from view

  21. Heat Pumps 101 To Snowmelt Loops Condenser Q Valve Compressor Evaporator Q From Geothermal Loops

  22. Heat Pumps • Entering temperature of 105 °F • Exiting temperature of 90 °F

  23. Pump House Design Plan View Isometric View

  24. Model Design • Concrete with installed piping and moisture sensor • Insulation • Sand Sub-base • Soil with installed vertical geothermal loop

  25. Model Control System

  26. Project Cost • Geothermal Snowmelt System Cost Breakdown

  27. Project Cost Comparison • Payback Period: 55 years

  28. Conclusions • Payback Period: 55 years • Our recommendation: Don’t do it!

  29. Conclusions • What else did we learn? • Teamwork on a multidisciplinary project • Defining project goals early on is important • Have Fun!

  30. Acknowledgements • Trent DeBoer, GMB Engineering • Steve Schultz, GMB Engineering • Charles Huizinga, Calvin College Physical Plant • Marc Huizinga, Calvin College Physical Plant • Professor Nielsen, Team Advisor • RenTubergen, Gumbo Product Development, Inc. • Bob Bruggink, Moore & Bruggink, Inc.

  31. Questions… Please ask !