190 likes | 343 Views
Luca Stanco - INFN Padova Krakow, 28 September 1999. BMUON: Status Report. Setup reminder Status of the Limited Streamer Tubes (LST) Triggers Efficiencies Y2K, online hang-up etc. Detector. BMUON. RMUON. Elettrons. Protons. BMUON detector.
E N D
Luca Stanco - INFN Padova Krakow, 28 September 1999 BMUON: Status Report • Setup reminder • Status of the Limited Streamer Tubes (LST) • Triggers • Efficiencies • Y2K, online hang-up etc.
Detector BMUON RMUON Elettrons Protons
BMUON detector • ~ 3 600 LSTs(with lenght from 0.7 to 10.2 m) • ~43 000 8-bit analog channels • ~ 29 000 digital channels Area detector > 2 000 m2 Resolution: 1 mm in the “strip” view 3 mm in the “wire” view Technical Coordinator: Riccardo Brugnera Web-master: Vincenzo Chiochia
LST Mortality... plus ~ 68 LST in trip for 10-40% of time plus ~ 10 LST in trip for 10-40% of time
LST DeadLST’sarenormallyswitched off Simulation in the Monte Carlo via an EAZE job: to evaluateefficiency dependence (small effect: 5%) BMUON - MC ideal - - MC with dead LST efficiency RMUON
BMUON Triggers Slot 8: Elastic Slot 10: InnerBMUON Slot 11: InnerRMUON Slot 14: OuterBMUON Slot 15: OuterRMUON FLT SLT Inner Outer TLT • GLOMU • GLOEXO
FLT rates... 1 mb for L= 10*1030 10 Hz (most of the runs)
GFLT with INNER chambers and with ISOMU: Calorimeter regions
SLT rates INNER OUTER
TLT GLOMU rates cosmics 30 nb for L= 10*1030 0.03 Hz
Efficiencies independent setup: efficiency vs HV working value to reduce trips
Efficiencies 100% HV: 4700 88% 100% HV: 4550 75% include inefficiency factor on single LSTin the Monte Carlo (15%)
Efficiencies - MC ideal - - MC with dead LST and 15% factor for HV BMUON efficiency RMUON 15% inefficiency coherent with analysis of single track segment !
Efficiencies ! Check efficiency with DATA themselves Two independent analysis on 2 track m+m- clean events (3 different set of events, depending of the trigger) BMUON SET 1 SET 2
Efficiencies Monte Carlo is off of an overall factor ! A few investigations performed. Not yet found out the reason... … much more in Alessandro Bertolin’ talk this afternoon
Some Technicalities ... Y2K • VMS computer for DAQ • patch from DEC (and spare mVAX from DELPHI available) • upgrade on going ... • Slow Control with OS9 (version 2.3 NOT good) • manual patch (bring time back, uff !) … • upgrade to 3.03 ?
Some Technicalities ... Online problem while Aborting Run ? Time for Aborting as function of Run ...
Some Technicalities ... Distribution of Time for Aborting ... for last positron runs...
BMUON Summary • Good general behaviour of the detector • Triggers under control • Efficiency studies on the way on • Few upgrades needed for next millenium Good perspectives for next millenium Runs