An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Extraction point and transfer measurements and vetos You what?

  2. Quality issues • For extraction system, have been told (EW) • That Dk (b1bg /en) = Dx/s < 0.5 • Contributions are • Bumpers 0.059 • MKE 0.254 • MSE 0.259 • Orbit 0.2mm? 0.24 (already large) Linear sum 0.812, Quadratic sum 0.44 (but not random)

  3. Extraction system equipment protection • BPCE interlock on bump: • veto if orbit > +/-1 mm • Power supply interlocks • Bumper, MSE, MBHC, MBHA • MKE interlocks • Charging voltage • Erratic / missing detection – fires clipper switch

  4. What we don’t have… • Beam intensity interlock • Needed already in 2003 – equipment safety & RP • Beam energy? • Beam size… • (what if CNGS beam extracted to TI 8…?)