260 likes | 512 Views
Janmitra Samadhan Kendra. Janmitra Samadhan Kendra. Akash Tripathi , Collector Indore. Janmitra The concept. Re-engineering G2C service delivery process - Decentralizing governmental interface - Process rationalization to compress service delivery time limits
E N D
Janmitra Samadhan Kendra Janmitra Samadhan Kendra Akash Tripathi , Collector Indore
Janmitra The concept • Re-engineering G2C service delivery process - Decentralizing governmental interface - Process rationalization to compress service delivery time limits • Ensuring on-field effectiveness of key field functionaries - Ascertaining timely, regular on-field presence of key field level functionaries in various departments - Monitoring and evaluation of on-field activity
Piloting Janmitra • Remote , dacoit infested and backward development block Barai selected for the pilot. • 12 Centers , each covering an average of 5 panchayats identified in pilot phase. • Phased scale up by April, 2010 – 48 Centers in the four blocks now In operation.
Three folds innovations in Janmitra • Innovations in attendance monitoring of field level functionaries • Innovations in service delivery • Innovations in MIS based data entry under NREGS at the Janmitra Kendra
Janmitra Attendance monitooring modules • Daily/twice/thrice a week attendance reporting of field functionaries of 13 departments at the Janmitra centres within their territorial jurisdiction • Biometric FingerprintIdentification Technology usedfor the module In-house interfacing software development by NIC Gwalior .
Janmitra Attendance monitoring modules • Periodic compilation of summary reports of attendance – used to affect salary cuts for absence/delay • An average of 50 field workers of 13 departments reporting daily at each Janmitra center • Attendance schedules drawn up for every field employee in 13 departments in the district and tested OK
Janmitra Service delivery module • A total of 72 services in 13 departments ; apart from NREGS’ sub-schemes identified for delivery • Services selected to be provided by authorized field functionaries visiting the centers. • In house software developed by NIC , Gwalior • Expanded basket of services delivered at the Gram Panchayat level • Opportunity cost (loss of day’s wages in travelling to the district headquarters) saved • Services decided in consultation with PRI representatives and HODs
Janmitra Concept contd.. Janmitra concept contd. • Combination of Offline and Online System • Dual System of OIC and Operator • Dual System vs Other Models
Decentralised mis data entry mnregs • Sub block level MIS data entry under NREGS - first time in the state • Point of data collection closer to the point of generation - Saves time and cost • Sub block module in NREGS’ software operationalized with NIC Delhi’s assistance . • Adds to the financial viability of the centre.
JANMITRA TECHNOLOGY ISSUES • Challenges : Current power situation in villages – 5-6 hours of supply usually at night; very poor network availability in villages. • Targets : Ensuring an uninterrupted 8 hour power solution in the working hours ; networking of the centers inter-se and with the block/district hqs. • Sine wave inverters with parallel batteries ( 750kVA), an extra battery for back up with the laptop and Dot Matrix Printers used.
JANMITRA TECHNOLOGY ISSUES • Dot Matrix Printers along with sine wave inverters make the power solution low cost, extremely reliable, making the centers function even in days of Zero supply for two consecutive days. • Internet Connectivity still a challenge- broadband links operational only in 10 centers; rest 37 still using NIC cards. • AMC for maintenance of Hardware
JANMITRA • Real time data transmission from the centers using a mix of broadband and data cards • Web based online module for tracking and monitoring by the Collector/Departmental Heads. • Extensive training of Centre Coordinators as well as computer operators • IEC for awareness generation
JANMITRA PROGRESS and Achievements • Testing for Block level pilot commenced in June 2009; pilot operationalized in September 2009 and scaled up to district level in April 2010. • 48 centers set up across rural Gwalior. 26 Centers are running in urban areas • More than 13 lacs applications are received till May 2014–. out of these i.e.98%. have been disposed off • Disposal rate maintained over 98% throughout. • 95.50% applications disposed within the time limits
Janmitra Comparative Servive delivery time Serivce delivery time for some of the services Domicile , Income Certificate , BPL certificate , Social Security Pension etc
Janmitra IIITM STUDY FACTORS CONTRIBUTING PROJECT SUCCESS IIITM conducted and independent survey . Survey report is available Janmitra website
Accolades for JanMitra • Chief Minister Excellence award • SKOCH ICT for India award 201o • CSI Nilihent Best E-District Initiative 2010 • MAP IT Best E-Governed district award 2010. • Stockhome Challange finalist in 2011 . • Manthan south asia award finalist 2011 . • MAP IT Awards in the category “IT for Masses” • Times of India Social Impact Award 2012 • Dainik Bhaskar India Pride Award • Widely appreciated by Media , Hon’ble MP & MLAs and local body representatives .
Janmitra on Youtube • Youtube URL for Janmitra Documentary http://www.youtube.com/watch?v=6lEGXSc9oHI http://www.youtube.com/watch?v=H8p8VQes9ts
JanMitra – The Road Ahead • Sustainability • Public Service Delivery Scenario • Replicability
JANMITRA SAMADHAN KENDRA • THANK YOU