60 likes | 190 Views
Node 2 Migration. Node Connections. Data Validation. Discovery. Security. State Nodes. CDX Node. V1. V1. EPA Program Nodes. V2. V2. Tribal Nodes. V1. V1. V2. V2. CDX NGN Node. Node End Points. Node 1.1 Endpoints:
E N D
Node Connections Data Validation Discovery Security State Nodes CDX Node V1 V1 EPA Program Nodes V2 V2 Tribal Nodes V1 V1 V2 V2 CDX NGN Node
Node End Points Node 1.1 Endpoints: • CDX Test https://test.epacdxnode.net/cdx/services/NetworkNodePortType_V10 • CDX Prod https://cdxnode.epa.gov/cdx/services/NetworkNodePortType_V10 • NGN Test https://testngn.epacdxnode.net/cdx-enws10/services/NetworkNodePortType_V10 • NGN Prod https://cdxnodengn.epa.gov/cdx-enws10/services/NetworkNodePortType_V10 Node 2.0 Endpoints: • CDX Test https://test.epacdxnode.net/cdx-enws20/services/NetworkNode2?wsdl • CDX Prod https://cdxnode.epa.gov/cdx-enws20/services/NetworkNode2?wsdl • NGN Test https://testngn.epacdxnode.net/ngn-enws20/services/NetworkNode2Service?wsdl • NGN Prod https://cdxnodengn.epa.gov/ngn-enws20/services/NetworkNode2Service?wsdl
State Node 2 Flow Migration • Current CDX Node: Enhanced to support basic Node V2.0 messages. • From State Nodes • From National System Nodes • All Exchange Network National System Flows become available to States via Node 2.0 messages at the same time. • Timeframe: September 30 , 2008
National System Node 2 Migration • Phase 1: Coordinate basic transition to Node 2.0 Sept. 2008 – Sept 2010 • Basic Messaging Upgrade - no enhancements • Phase 2: Identify flows to migrate to Next Generation Node 2.0 (NGN) • Leverage new Node 2.0 Features • Leverage New Node Architecture