40 likes | 143 Views
Analysis Plans 16.10.2012. We’ve/’ll collected data from different testbeam periods June’12 ( Performace of MM in a B magnetic field) July’12 ( uTPC , VMM1) Sept’12 ( uTPC , VMM1, large chamber L1) Oct’12 ( uTPC , VMM1, Trigger scheme, L1).
E N D
We’ve/’ll collected data from different testbeam periods • June’12 (Performace of MM in a B magnetic field) • July’12 (uTPC, VMM1) • Sept’12 (uTPC, VMM1, large chamber L1) • Oct’12 (uTPC, VMM1, Trigger scheme, L1) • Need to analyze the data in a systematic way for: • Vienna conference, Feb 2013 • January Review meeting • TDR, May 2013