1 / 4

Analysis Plans 16.10.2012

Analysis Plans 16.10.2012. We’ve/’ll collected data from different testbeam periods June’12 ( Performace of MM in a B magnetic field) July’12 ( uTPC , VMM1) Sept’12 ( uTPC , VMM1, large chamber L1) Oct’12 ( uTPC , VMM1, Trigger scheme, L1).

yuval
Download Presentation

Analysis Plans 16.10.2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Analysis Plans16.10.2012

  2. We’ve/’ll collected data from different testbeam periods • June’12 (Performace of MM in a B magnetic field) • July’12 (uTPC, VMM1) • Sept’12 (uTPC, VMM1, large chamber L1) • Oct’12 (uTPC, VMM1, Trigger scheme, L1) • Need to analyze the data in a systematic way for: • Vienna conference, Feb 2013 • January Review meeting • TDR, May 2013

More Related