An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EUI operation and adjustments Filling of chamber by lift pump pressure Cam forces plunger down to raise pressure in chambers Solenoid activation + Cam forcing plunger down to create high pressure and nozzle opening Solenoid deactivated + Cam forcing plunger down to create pressure drop and nozzle closing • Fuel delivery and timing is dependant on: • The duration and point of time that the solenoid is activated, (controlled by ECU on engine or Ocres on test-bench) not adjustable. • The reaction time of the solenoid electrically to magnetic strength, (controlled by the electrical and magnet properties of the solenoid) not adjustable, fit new solenoid. • The reaction time of the valve closing against spring pressure, (controlled by the holding spring and adjustment shim) adjusted by changing shim thickness. • The pressure raised by the plunger, (controlled by the sealing properties of the plunger to the bore) not adjustable. • The reaction time of the nozzle opening against spring pressure (controlled by the return spring and adjustment shim) adjusted by changing shim thickness. • The flow characteristic of the nozzle; Low, Medium, High (grading determined by manufacturing tolerances), compensated for by changing items 3, 5 or both.

  2. EUI operation and adjustments • Adjustments need to take all dependencies into consideration and any adjustments there of? • Solenoid shim adjustment • To overcome a slow solenoid activation • To adjust fuel delivery • To overcome manufacturing tolerances in nozzle flow (L, M, H) • To adjust injection timing point (adjust delay time) • Nozzle shim adjustment • To adjust fuel delivery • To overcome manufacturing tolerances in nozzle flow (L, M, H)

  3. EUI operation and adjustments • Adjustments will have the following effects? • Solenoid shim adjustment (within tolerances) • Increasing the shim thickness will:- • Make the response time longer (0.02mm = + 8µs) • Make the fuel delivery reduce (0.02mm = -1mm3/St) • Reducing the shim thickness will:- • Make the response time shorter (0.02mm = - 8µs) • Make the fuel delivery increase (0.02mm = +1mm3/St) • Nozzle shim adjustment (within tolerances) • Increasing the shim thickness will:- • Make the fuel delivery reduce (adjustment for high flow nozzle, set on upper limit) • Reducing the shim thickness will:- • Make the fuel delivery increase (adjustment for low flow nozzle, set on lower limit)