An optimal scheme for Multiprocessor task scheduling: A machine learning approach • Aryabrata Basu, Shelby Funk • University of Georgia
The NQ Wrap Algorithm 14 0 2 4 6 8 10 12 16 18 Task Set τ= [ T1,T2,T3,T4 ] T1 = (12,6), T2 = (8,5), T3 = (10,6), T4 = (11,5) 30th IEEE Real Time Systems Symposium 2009
The NQ-Wrap Algorithm (cont.) T1 = (12,6), T2 = (8,5), T3 = (10,6), T4 = (11,5) σ1 = [0,8[ ℓ1,0= 8·6/12 = 4 and ℓ2,0= 5, ℓ3,0= 4.8 and ℓ4,0= 3.6 T1 T2 T3 T4 14 0 2 4 6 8 10 12 16 18 T1 T2 p1 T1 T2 T2 T3 p2 T4 T T3 p3 T4 0 2 4 6 8 10 12 σ0 σ1 σ2 σ3 30th IEEE Real Time Systems Symposium 2009
Reducing the Overhead T1 = (12,6), T2 = (8,5), T3 = (10,6), T4 = (11,5) ℓ1,0= 8·6/12 = 4 and ℓ2,0= 5, ℓ3,0= 4.8 and ℓ4,0= 3.6 ℓ1,0 can be increased to 6 without causing any deadline misses T1 T2 T3 T4 14 0 2 4 6 8 10 12 16 18 T1 T2 p1 T2 T3 T1 T1 T2 T2 4 preemptions avoided T2 T2 T3 T3 p2 T4 T T4 T3 p3 T4 T4 0 2 4 6 8 10 12 σ0 σ1 σ2 σ3 30th IEEE Real Time Systems Symposium 2009
Reducing the Overhead T1 = (12,6), T2 = (8,5), T3 = (10,6), T4 = (11,5) ℓ1,0= 8·6/12 = 4 and ℓ2,0= 5, ℓ3,0= 4.8 and ℓ4,0= 3.6 ℓ3,0 can also be increased to 5 and ℓ2,1 can be increased to 2 T1 T2 T3 T4 14 0 2 4 6 8 10 12 16 18 p1 T2 T2 T3 T1 T1 T2 T2 2 migrations and 2 preemptions avoided 4 preemptions avoided T2 T2 T3 T3 p2 T4 T4 p3 T4 T4 0 2 4 6 8 10 12 σ0 σ1 σ2 σ3 30th IEEE Real Time Systems Symposium 2009
A Generic Machine Learning System System … … Input Variables: x = (x1, x2, …, xN) Hidden Variables: h = (h1, h2, …, hK) Output Variables: y = (y1, y2, …, yM) Machine Learning algorithms discover the relationships between the variables of a system (input, output and hidden) from direct samples of the system 30th IEEE Real Time Systems Symposium 2009
Improve the Schedule With Machine Learning Modeling tasks w/in a time-slice Task Ti Remaining work Remaining work Remaining time Remaining time Work done Work done (feedback) 30th IEEE Real Time Systems Symposium 2009
Improve the Schedule With Machine Learning Modeling a time-slice Timeslice Remaining work Remaining work Remaining work Task Tn Task T1 Remaining work Remaining time Remaining time Remaining time Remaining time Work done Work done Work done (feedback) … … Workdone(feedback) System Slack (out) System Slack Overload Overload Underload Underload 30th IEEE Real Time Systems Symposium 2009
Future Work Experimental evaluation of minimization of number of task preemptions and migrations needs to be validated in different scenarios. Extend the Machine Learning technique to sporadic task sets, where deadlines ≠ periods. Explore various implementation of machine learning techniques other than like ANN, like the Case based reasoning (CBR), inductive learning, etc. 30th IEEE Real Time Systems Symposium 2009