1 / 40

Municipal Solid Wastes

Municipal Solid Wastes. CE 326 Principles of Environmental Engineering Prof. Tim Ellis February 1, 2010. http://www.pbase.com/globetrotter81/image/45798332. What is a solid waste.

zahina
Download Presentation

Municipal Solid Wastes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Municipal Solid Wastes CE 326 Principles of Environmental Engineering Prof. Tim Ellis February 1, 2010 http://www.pbase.com/globetrotter81/image/45798332

  2. What is a solid waste • all wastes from human and animal activities that are normally s_____ or semi-s____ and are d___________ (includes municipal, industrial, and hazardous wastes). olid olid iscarded http://www.pbase.com/globetrotter81/

  3. What is Solid Waste Management? • activities involved with the • reduction of g________, • c_____________ eneration ollection

  4. What is Solid Waste Management? torage • s__________, t___________, p_________, and d_____________ of solid wastes. ransportation rocessing isposal

  5. Trash to energy

  6. What is Solid Waste Management? • solid waste management concerns • public h__________, • e______________, • e______________, • conservation, • aesthetics, and • other environmental considerations. ealth nvironment conomics

  7. What is Integrated Solid Waste Management? Activities designed to meet the hierarchy of MSW management objectives S______ R______ ource eduction ecycle euse R______ and R___ reatment T__________ isposal D_______ http://www.pbase.com/globetrotter81/

  8. Waste G_________ eneration • Waste h_______, s_________, s______, • and p__________ at the source: • shredding, baling • separation for recycling auling eparating torage rocessing ollection C__________ rocessing • P_______ Facility • r_______ • r_______ r_______ • i_____________ • c___________ ecycling T_______ Station ransfer esource ecovery ncineration omposting • U_______ D_________ • landfill ltimate isposal http://www.pbase.com/globetrotter81/

  9. Quantities of Solid Waste Produced • total production is approximately = _____ million tons/yr (decrease of 1.6 M tons from 2004) • average solid waste generated per person = ___ lbs/day • total production in U.S.= _________ tons/day • density = _____ lbs/yd3 • if placed in 3 foot layer, it would cover _____ sq. yds. • ____ sq. miles • if placed in 1 cu. ft. stacks, it would rise ______ miles high 220 4.4 4.4 4.4 8 m 2.5 40,800

  10. One year’s worth of solid waste from a single household

  11. Characterization of Solid Waste • Kind, composition, and source. • Material • Product category

  12. Characterization of Solid Waste • Two mains categories: • G_________ • animal and vegetable waste resulting from f______ preparation, originates primarily from k________ and r__________ large part of the putrescible matter in MSW, source of o_______ arbage ood itchens estaurants dors

  13. Characterization of Solid Waste • R__________: • combustible and non-combustible components of MSW • combustible fraction includes: • p_______, r______, cartons, boxes, furniture, tree branches,etc. • T___________ is synonymous with combustible portion of rubbish • Noncombustibles • includes i_______ portion of rubbish: • tin cans, • metals, • glass, etc. ubbish aper ags rash norganic

  14. Other categories sh • A________ • S_______ Refuse • Dead A__________ • Abandoned v____________ • I____________ Wastes (food processing wastes, lumber and metal scraps, shavings) • D__________ Wastes (lumber, pipes, bricks, masonry) • C_____________ Wastes (lumber, pipe, scraps) • Special Wastes (includes hazardous substances, explosives, radioactive materials) • W_____________Treatment Plant Residues (includes screenings and grit) treet nimals ehicles ndustrial emolition onstruction atewater

  15. MSW Composition by Material • p_________ and paperboard • g__________ • m_______ (steel, aluminum, other nonferrous metals) • p__________ • r_________ and leather • t___________ • w_________ • other m___________ aper lass etal lastics ubber extiles ood aterials

  16. MSW Composition by Product Category • c_____________ and packaging • n___________ goods (e.g., newspapers, “selected consumer electronics”) • d___________ goods (e.g., appliances) • y_________ trimmings • f__________ scraps • other ontainers ondurable urable ard ood

  17. Integrated Solid Waste Management • Priority is on s________ r____________ ource eduction

  18. Second Priority following Source Reduction is Recycling and Reuse. • ____% recycling rate in 1999 (64 M tons) vs. 32% in 2005 (58.4 M tons MSW + 20.6 M tons compost) • _______ curbside recycling programs in 1998 vs. 8,550 in 2005 • _______ yard trimmings and composting programs in 1997 vs. 3,470 in 2005 • combusted for energy recovery • 2.7 M tons 1980 • 29.7 M tons 1990 • 33.4 M tons (13.6%) 2005 28 9300 3800

  19. Least Favorable MSW Management Activity: Ultimate Disposal (e.g., landfills) • Number of landfills in U.S. continues to decrease from about ________ in 1988 to about ________ today 8000 3500

  20. azardous astes aily over isease ectors • Landfills must: • keep out regulated h__________ w_________ • apply a d______ c__________ • control d________ v______ populations (rodents, flies, mosquitoes, etc.) • m________ m_______ g___ • restrict p________ a_________ • control s____ w______ run-on and run-off • protect s______ water from p_________ and • keep appropriate r_________ onitor ethane as ublic ccess ater torm urface ollutants ecords

  21. rinking ater • Design Standards • Landfills must be designed to ensure d______ w______ standards are not exceeded in ground water. • Landfills must be designed with a c__________ l______ made of synthetic material covering a two-foot c___ l_____. omposite iner lay iner

  22. Ground-water Monitoring and Corrective Action • All landfills must have monitoring w____ to detect any groundwater contamination. • if ground-water is contaminated, the owner/operator is required to clean it up to acceptable standards to protect human health and the environment. ell

  23. Closure and Post-Closure Care • When a landfill stops accepting waste it must be covered to keep any liquid away from the buried waste. • Once the landfill is closed, the owner/operator is responsible for • maintaining the final cover, • monitoring ground water and methane gas, • and continuing leachate management for 30 years.

  24. Financial Assurance • Landfill owners/operators must show that they have f___________ mechanisms to cover the costs of closure, post-closure care, and any needed cleanups from releases. • Financial mechanisms can include s_______ bonds, letters of credit, insurance, or guarantees, among others. inancial urety

  25. Financial Assurance • The majority of landfills are small (less than 20 tons of municipal solid waste per day) and some may qualify for an exemption from the design standards, ground-water monitoring, and corrective action requirements. • To qualify for an exemption, a small landfill must not be causing ground-water contamination, and must be located in either a very dry climate or a very remote location.

  26. Parts of a Solid Waste Landfill:

  27. Parts of a Solid Waste Landfill:

  28. Liner: • Composite:

  29. Leachate: • LCRS:

  30. Cell: • Daily Cover: • Lift: • • Final Lift:

  31. Final Cover • Cap

  32. Post Closure

  33. Sri Lanka 2003 Compost

More Related