An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Nov 7, 2006@KEK ND280mOverview of the activities T. Nakaya (Kyoto)

  2. Outline • Overall activities (ND280 meeting: 11/7-8) • http://www.nd280.org/meetings/nd280200611/ • Important subjects at this meeting • UA1 Magnet (CONV, IBR, TB, …) • SMRD Installation (CONV., IBR, TB, …) • Elec/DAQ/Online/Slow-control/Offline/Software group organization (A special ad hoc committee). • Unclear items including schedule conflict (→ CONV, TB) • Schedule • IPNS ND280 Review (11/27-28)

  3. 1. Overall activities • Nov. 7, 8 from 8:00 – 22:00. • http://www.nd280.org/meetings/nd280200611/ • Conveners meeting, • Software, • Elec/DAQ, • Technical Board (TB), • SMRD, • TPC, • FGD, • INGRID, • P0D, • ECAL, • Photo-sensor, • Scintillator/Fiber • Magnet

  4. 1. UA1 Magnet • The magnet must arrive in Japan before Nov. 2007 (one year from now). • The recovery (sandblasting and paining) must be finished by the end of June 2007. • Intensive discussions in the conveners, IBR, TB, special meetings. • We are working hard for this key component. • Technical aspects • Financial aspects

  5. April May June MAGNET ACTIONS Vs TIME Jan Febr March ACCESS TO THE PIT 2006 2007 2009 2008 RECOVERY DESIGN PRODUCTION YOKE SHIPMENT No south bridge from Nov 2007 COILS, MMS, BASKET SUPPORT SHIPMENT MMS, YOKE, COIL BASKET SUPPORT INSTALLATION CONTROL & SAFETY SYSTEM INSTALLATION

  6. 2. SMRD Installation • Two Important milestones • Survey of the magnet yoke • 8mm thick scintillator modules are required. • Will test the 7mm thick scintillator by the end of this year. • Installation of the modules after construction of magnet and facility building. • Mock-up test at LSU and CSU • Arrangement of the sinitillator modules • Must be optimized for physics case. • Have an answer by January 2007.

  7. 3. Elec/DAQ/Online/Slow-control/Offline/Software group organization • Ad hoc committee met to discuss the group structures. The recommendations are Electronics [A. Weber] Slow-Control [R. Poutissou] DAQ/Online [G. Pearce] Software/Offline [C. McGrew, Y. Uchida]

  8. 4. Unclear items including schedule conflict (→ CONV, TB) • We also work to identify the unclear items in the TB members. • Common fund items. • Missing items. • The uncertainty of schedule and conflict also will be discussed in the TB meeting.

  9. ND280 Schedule • It is shown by Tsukamoto-san. • We have only 28 month before we have the beam • Obviously, the ND280 is a complicated system. We may have many risky aspects in the project (technically, financially, ...). However, so far, we work hard trying to keep schedule including very challenging device. • TPC, ASIC, Elec., Photo-sensor, etc.. => Need Review !

  10. IPNS ND280 Review (11/27-28) Nov. 27th (Mon) • Overview/Introduction 930-1000 ??? • 930- 945 General T2K Physics T. Nakaya (15 min.) • 945-1000 Beam line status T. Kobayashi/Y. Yamada/A.K.Ichikawa? (15 min.) • ---------------------------------------------------------------------------- • 1000-1015 ND280 overview T. Nakaya (15 min.) • 1015-1030 Facility T. Tsukamoto (15 min.) • 1030-1040 (coffee break) • 1040-1130 Physics A. Konaka (50 min.) • 1130-1220 INGRID T. Nakaya (50 min.) • 1220-1330 (Lunch) • 1330-1400 Magnet P. Loverre ? (30min.) • 1400-1450 FGD S. Oser (50 min.) • 1450-1540 TPC D. Karlen and M. Zito (50 min.) • 1540-1555 (coffee break) • 1555-1645 P0D C. Mcgrew/K. McFarland (50 min.) • 1645-1735 ECAL C. Touramanis (50 min.)

  11. Nov. 28th (Tue) • 900- 950 SMRD T. Kutter (50 min.) • 900-1040 Photo-Sensor Y. Kudenko/M.Yokoyama (50 min.) • 1040-1050 (coffee break) • 1050-1105 Installation/schedule T. Tsukamoto (15min.) (Electronics/DAQ) • 1105-1135 FGD electronics F. Retiere (30min.) • 1135-1205 TPC electronics Saclay member? (30min.) • 1205-1315 (Lunch) • 1315-1345 Scintillator detecetors A. Weber (30min.) • 1345-1415 DAQ G. Pearce (30min.) • Closed session 1415- The review document will be distributed inside the collaboration soon after this T2K meeting.