1 / 3

Updates from Lab 4-120

Updates from Lab 4-120. Andrew Peck & Shayan Rastegari October 21, 2013. Since last meeting. Repaired: Repaired 11 TMBs Found Samtec shorts on 3 TMBs (easy but tedious repair). The other five have unidentified shorts (to discard). RAT Boards:

zaide
Download Presentation

Updates from Lab 4-120

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Updates from Lab 4-120 Andrew Peck & ShayanRastegari October 21, 2013 2

  2. Since last meeting • Repaired: • Repaired 11 TMBs • Found Samtec shorts on 3 TMBs (easy but tedious repair). • The other five have unidentified shorts (to discard). • RAT Boards: • Purchase order is finally done and submitted to Murrietta. Estimated 3-4 weeks to receive first article board for testing. • Ordered additional boxes from Uline. Most of the electronics are now packaged up and ready for shipping. • 6 of the new ALCT-384 boards are coming from CERN for repairs. Ran into trouble with the ALCT tester board Electronics still at UCLA: • 4 of ALCT-288 • 4 good • 0 bad • 15of ALCT-384 (old) • 12 good • 3 bad • 3 of ALCT-384 (new) • 3 good • 0 bad • 7 of ALCT-672 • 5 good • 2 bad • 28 of TMB2005 • 25 good • 3 bad • 8 of RAT2005 • 3 good • 5 bad • 12 of S6-Mezzanine • 8 good • 4 bad 2

  3. To do: • Finish shipping electronics to CERN. • Finish the last electronics for repair • Expect 2 ALCT-672, 2 ALCT-384, 3 TMBs, 1 Spartan-6 Mezzanine that can be fixed + most of the new ALCT-384 boards coming from CERN. • When RAT boards are ready… test and repair. 2

More Related