1 / 8

Remediation of the Hazardous Waste Landfill in Kölliken, Switzerland

Division. Remediation of the Hazardous Waste Landfill in Kölliken, Switzerland. Dr. Bernhard Hammer ---------------------------------------------------------- NATO/CCMS Pilot Study Meeting Athens, 5 -7 June 2006. Agenda. Bernhard Hammer: Introduction Principles of sustainable remediation

zalman
Download Presentation

Remediation of the Hazardous Waste Landfill in Kölliken, Switzerland

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Division Remediation of the Hazardous Waste Landfill in Kölliken, Switzerland Dr. Bernhard Hammer ---------------------------------------------------------- NATO/CCMS Pilot Study Meeting Athens, 5 -7 June 2006

  2. Agenda Bernhard Hammer: • Introduction • Principles of sustainable remediation • The Kölliken landfill site – general informations Jean-Louis Tardent: • Remediation - Technical aspects • Introduction to the film Film

  3. like that? What is Switzerland?

  4. it’s also like that! Chromium VI-Emissions! hundred thousands of tons of chemical waste! Brownfields! What is Switzerland?

  5. Contaminated land in Switzerland • no significant mining activities • hardly any heavy industries • few extended industrial areas • no war-related contamination • long tradition of waste incineration but... • high population densities • little construction land available, expensive land • intensively farmed soil, high quality requirements • intensively used groundwater (80% of drinking water) • most contaminated sites lie on groundwater deposits • few large sites - many small sites

  6. drinking water well Landfill Landfill Kölliken landfill - General Situation 1978 – 1985: 250’000 m3 of hazardous wastes area: 40‘000m2

  7. Persistant polluted site / PEPSI • Kölliken Landfill site = PEPSI site • High percentage of persistant pollutants • Persistant pollutants well dispersed, not extractable • (in-situ measures not applicable) • Degradation & lixiviation of pollutants >>> 50 years • Substantial danger exists over long periods • (up to x00 years)

  8. Remediation strategy • For the Kölliken site decontamination is indicated • Decontamination is the only solution for a • long-term successfully and economically remediation • In 2003 the authorities decreed the complete excavation • of the landfill by 2012. • Decontamination costs: 350 Mio. $ (excavation and • off-site treatment) • Containment methods would have very high consumer • costs for the long-term operation over hundreds of years: • - Containment costs to date: 100 Mio. $ • - Annual treatment/monitoring costs: 4 Mio. $

More Related