An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ELI-NP Conceptual Design Report Daniel Ursescu, Coordinator for Research Activities 1: ELI-NP Laser INFLPR, Romania

  2. ELI-NP Facility 2 lasers, 10 PW each

  3. White book of ELI-NP: Conceptual Design Report

  4. Conceptual Design Report:Criteria

  5. Basic solution Back-up solution Conceptual Design Report:Technologies comparison

  6. Conceptual Design Report:Ti:Sa Solution Laser experimenta area Technical areas Multi-PW laser Solution based on Apollon design

  7. Conceptual Design ReportNd:Glass Solution

  8. Goals for this workshop 1) analyze the bottlenecks and associated risks, knowing that: - the timeline for the project is January 2012 - August 2015, - we prefer a turn-key laser system, due to commercial conditions such as guarantees - UE offset conditions might apply 2) initialize a review of the cost evaluation (80 Meuro) 3) to confirm the existing solutions (and identify new technological oportunities)

  9. Bottle-necks Bottle-neck ................. risks: - present technology limit: - time-line development: - design: - demonstrator: - provider: - budget: - back-up: List of botlenecks a) b) c) ...

  10. Program

  11. Bottle-neck ...gratings... risks: - present technology limit: 0.15 J/cm^2, 90 cm*70 cm - needed: higher damage threshold - time-line development: until Sept. 2013 - design: exists at ILE - demonstrator: up to 50 mm - provider: JY, LLNL, PGL - budget: 150 Keuro each - back-up: existing JY, LLNL or PGL, 2 times more expensive

  12. Bottle-neck ................. risks: - present technology limit: - time-line development: - design: - demonstrator: - provider: - budget: - back-up: